Power Systems The capacitance of an overhead transmission line increases with increase in height of conductors above ground increase in mutual geometrical mean distance both 1 and 2 neither 1 nor 2 increase in height of conductors above ground increase in mutual geometrical mean distance both 1 and 2 neither 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Suspension type insulators are used for voltage beyond 230 V 11 kV 33 kV 440 V 230 V 11 kV 33 kV 440 V ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows : Ipositive = j1.5 pu, Inegative = − j0.5 pu, Izero = − j pu Which fault is this? LLLG. LG. LLG. LL. LLLG. LG. LLG. LL. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 740 MW. 730 MW. 720 MW. 710 MW. 740 MW. 730 MW. 720 MW. 710 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rate of rise of re-striking voltage is dependent upon both 1 and 2 capacitance of the system only resistance of the system only inductance of the system only both 1 and 2 capacitance of the system only resistance of the system only inductance of the system only ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro electric generating station is supplied from a reservoir of capacity 5 × 10 − 6 cubic meters at a head of 200 meters. Find the total energy available in KWh if the overall efficiency is 75 % 4.06 × 106 kWh. 3 × 106 kWh. 2.044 × 106 kWh. 5 × 106 kWh. 4.06 × 106 kWh. 3 × 106 kWh. 2.044 × 106 kWh. 5 × 106 kWh. ANSWER DOWNLOAD EXAMIANS APP