Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 500/5. The plug setting multiplier for a fault current of 5 kA is 5 8 6 2 5 8 6 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 150 MW and PG2 = 100 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 250 MW and PG2 = 0 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In thermal plant most of the energy is wasted in condenser boiler ESP turbines condenser boiler ESP turbines ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line is operating under no load has ABCD parameters B = 100∠90° has a phase shift of 0.2 rad, how much shunt reactor is required for compensation of ferranti effect? 2 mH 15.9 H 15.9 mH 2 H 2 mH 15.9 H 15.9 mH 2 H ANSWER DOWNLOAD EXAMIANS APP
Power Systems The draw back of NR method as compare to Gauss-Seidel method is/are? large number of iterations large requirement of computer memory both 1 and 2 None of these large number of iterations large requirement of computer memory both 1 and 2 None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The total number of strands in a ACSR conductor are 7, then find the layer number? 7 3 2 5 7 3 2 5 ANSWER DOWNLOAD EXAMIANS APP