Power Systems A generating station which has a high investment cost and low operating cost is usually operated as a Peak load station. None of above. Base load station. Minimum load station. Peak load station. None of above. Base load station. Minimum load station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following grounding is not practically preferred for protection of equipments? All of these isolated grounding resistance grounding reactance grounding All of these isolated grounding resistance grounding reactance grounding ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive (Z1), negative (Z2) and zero sequence (Z0) impedances of a transmission line follows the relation (Z1 = Z2) > Z0 (Z1 = Z2) < Z0 any of the above Z1 = Z2 = Z0 (Z1 = Z2) > Z0 (Z1 = Z2) < Z0 any of the above Z1 = Z2 = Z0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of a surge tank is to relieve water hammer pressure in the penstock. supply water at constant pressure. produce surge in the pipeline. none of above. relieve water hammer pressure in the penstock. supply water at constant pressure. produce surge in the pipeline. none of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are the advantages of synchronous phase modifier over the shunt compensation? both 1 and 2 initial cost is low smooth voltage regulation is possible by controlling excitation single unit can be used as both capacitance and inductor by adjusting the excitation both 1 and 2 initial cost is low smooth voltage regulation is possible by controlling excitation single unit can be used as both capacitance and inductor by adjusting the excitation ANSWER DOWNLOAD EXAMIANS APP
Power Systems For loss less line, find the ratio of length to the wave length of a signal for a phase shift of 0.05 radians? 7.95 × 10³ 7.95 × 10-3 2 × 10-3 8 × 10³ 7.95 × 10³ 7.95 × 10-3 2 × 10-3 8 × 10³ ANSWER DOWNLOAD EXAMIANS APP