Power Systems A generating station which has a high investment cost and low operating cost is usually operated as a None of above. Minimum load station. Base load station. Peak load station. None of above. Minimum load station. Base load station. Peak load station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3 core cable gives on test a capacitance of 3.7 µF between two cores. Find the line charging current of the cable when it is connected to 11 kV, 50 Hz system? 1.476 A. 14.7 mA. 1 A. 14.76 A. 1.476 A. 14.7 mA. 1 A. 14.76 A. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the relation between sub transient (X"), transient (X') and synchronous reactance (X) ? X" < X' < X X" > X' < X X" > X' >X X" < X' > X X" < X' < X X" > X' < X X" > X' >X X" < X' > X ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statement is/are true regarding infinite line? It maintains the constant voltage It has infinite voltage It has infinite length both 2 and 3 It maintains the constant voltage It has infinite voltage It has infinite length both 2 and 3 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Incremental cost of two generators Ic1 = 0.2 P1+60, Ic2 = 0.3 P2+40 and the ratings of the generator are 150 and 250 MW. Find the load sharing of each generator for a load of 200 MW? P1 = 120 MW, P2 = 80 MW P1 = 60 MW, P2 = 140 MW P1 = 100 MW, P2 = 100 MW P1 = 80 MW, P2 = 120 MW P1 = 120 MW, P2 = 80 MW P1 = 60 MW, P2 = 140 MW P1 = 100 MW, P2 = 100 MW P1 = 80 MW, P2 = 120 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The steam power plant efficiency can be improved by using large quantity of water. using high temperature and high pressure steam. decreasing the load on the plant. burning large amount of coal. using large quantity of water. using high temperature and high pressure steam. decreasing the load on the plant. burning large amount of coal. ANSWER DOWNLOAD EXAMIANS APP