Power Systems A generating station which has a high investment cost and low operating cost is usually operated as a Minimum load station. Peak load station. None of above. Base load station. Minimum load station. Peak load station. None of above. Base load station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has impedance of (0.005 + j0.05) pu. Find the line at which maximum value of negative DC off set current is produced, if it is applied with Vm cosωt? 9.68 2.63 msec 4.68 msec 1.47 msec 9.68 2.63 msec 4.68 msec 1.47 msec ANSWER DOWNLOAD EXAMIANS APP
Power Systems Corona is accompanied by hissing sound All of these violet visible light power loss and interference hissing sound All of these violet visible light power loss and interference ANSWER DOWNLOAD EXAMIANS APP
Power Systems For n bus power system size of Y bus matrix is n×n (n-1)×(n-1) (n-2)×(n-2) (n-1)×(n-2) n×n (n-1)×(n-1) (n-2)×(n-2) (n-1)×(n-2) ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ideal plant load cfactor is less than 1 1 greater than 1 0 less than 1 1 greater than 1 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants both operating and initial cost are low. operating cost is high and initial cost is low. operating cost is low and initial cost is high. both operating and initial cost are high. both operating and initial cost are low. operating cost is high and initial cost is low. operating cost is low and initial cost is high. both operating and initial cost are high. ANSWER DOWNLOAD EXAMIANS APP