Power Systems If we increase the length of the transmission line, the charging current remains unaffected None of these increases decreases remains unaffected None of these increases decreases ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 100 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 15 MW 20 MW 80 MW 10 MW 15 MW 20 MW 80 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power station needs space less than that required by the diesel power station of same output. less than that required by a gas turbine power plant of same output. less than that required by hydro-power station of same capacity. less than that required by atomic power station of the same output. less than that required by the diesel power station of same output. less than that required by a gas turbine power plant of same output. less than that required by hydro-power station of same capacity. less than that required by atomic power station of the same output. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If L and C are 4 mH and 0.0001 μF respectively a current chop of magnitude 50 Amp would induced a voltage 100 kV. 200 kV. 50 kV. 400 kV. 100 kV. 200 kV. 50 kV. 400 kV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is an impulse turbine Kaplan turbine. Pelton turbine. Francis turbine. None of above. Kaplan turbine. Pelton turbine. Francis turbine. None of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 0.5 0.75 1 0.6 0.5 0.75 1 0.6 ANSWER DOWNLOAD EXAMIANS APP