Power Systems If we increase the length of the transmission line, the charging current increases decreases None of these remains unaffected increases decreases None of these remains unaffected ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 400 KV network, 360 KV is recorded at a 400 KV bus. The reactive power absorbed by shunt rated for 50 MVAr, 400 KV connected at the bus is 45 MVAr. 55.56 MVAr. 40.5 MVAr. 61.73 MVAr. 45 MVAr. 55.56 MVAr. 40.5 MVAr. 61.73 MVAr. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the sag(S) of a transmission line? S = wl²/4T S = wl²/2T S = wl²/8T S = wl²/16T S = wl²/4T S = wl²/2T S = wl²/8T S = wl²/16T ANSWER DOWNLOAD EXAMIANS APP
Power Systems The annual depreciation of hydro power plant is about 15 - 20 %. 0.5 - 1.5 %. 20 - 25 %. 10 - 15 %. 15 - 20 %. 0.5 - 1.5 %. 20 - 25 %. 10 - 15 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading (SIL) is represented by Vl²/Zs Vph²/Zs Vl²*√(C/L) both 1 and 2 Vl²/Zs Vph²/Zs Vl²*√(C/L) both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 0 MW and PG2 = 250 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 100 MW and PG2 = 150 MW ANSWER DOWNLOAD EXAMIANS APP