Power Systems If we increase the length of the transmission line, the charging current decreases None of these increases remains unaffected decreases None of these increases remains unaffected ANSWER DOWNLOAD EXAMIANS APP
Power Systems Length of short transmission line is up to any of the above 80 km 40 km 150 km any of the above 80 km 40 km 150 km ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Gauss Seidel load flow method has following disadvantages. Which of the following statement is wrong? Choice of slack bus affects the convergence Unreliable convergence A good initial guess for voltages is essential for convergence Slow convergence Choice of slack bus affects the convergence Unreliable convergence A good initial guess for voltages is essential for convergence Slow convergence ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with reaction and adjustable vanes is Impeller. Kaplan. Pelton. Francis. Impeller. Kaplan. Pelton. Francis. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an interconnected power system, the most suitable power plant to meet the peak load condition is hydro power plant pumped storage plant nuclear plant thermal plant hydro power plant pumped storage plant nuclear plant thermal plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line is operating under no load has ABCD parameters B = 100∠90° has a phase shift of 0.2 rad, how much shunt reactor is required for compensation of ferranti effect? 2 mH 2 H 15.9 H 15.9 mH 2 mH 2 H 15.9 H 15.9 mH ANSWER DOWNLOAD EXAMIANS APP