Power Systems If we increase the length of the transmission line, the charging current increases remains unaffected None of these decreases increases remains unaffected None of these decreases ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants operating cost is low and initial cost is high. both operating and initial cost are low. operating cost is high and initial cost is low. both operating and initial cost are high. operating cost is low and initial cost is high. both operating and initial cost are low. operating cost is high and initial cost is low. both operating and initial cost are high. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Storage requirement can be determined from hydro-graph. flow duration curve. both B and C. mass Curve. hydro-graph. flow duration curve. both B and C. mass Curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where the voltage is high and current to be interrupted is low, Which of following the breaker is preferable? Oil CB. Any of these. Air blast CB. Vacuum CB. Oil CB. Any of these. Air blast CB. Vacuum CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a plant capacity of 200 MW and maximum power demand is 150 MW. If average power generation is 110 MW, then find the load factor and capacity factor respectively? 0.733 and 0.55 0.733 and 0.65 0.65 and 0.55 0.55 and 0.733 0.733 and 0.55 0.733 and 0.65 0.65 and 0.55 0.55 and 0.733 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Nuclear. Thermal. Gas-turbine. Hydro Power Plant Nuclear. Thermal. Gas-turbine. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP