Power Systems In thermal plant most of the energy is wasted in turbines boiler ESP condenser turbines boiler ESP condenser ANSWER DOWNLOAD EXAMIANS APP
Power Systems When reactance grounding is used in network, the voltage between neutral and ground is IN × Xn both 1 and 3 3×IR0 × Xn IR0 × Xn IN × Xn both 1 and 3 3×IR0 × Xn IR0 × Xn ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mho relay is usually employed for protection of short transmission lines only long transmission lines only medium transmission lines only any line short transmission lines only long transmission lines only medium transmission lines only any line ANSWER DOWNLOAD EXAMIANS APP
Power Systems Objectives of power system is/are both 1 and 2 Rated voltage and frequency has to be supplied to the consumers Cost of electrical energy per KWh is to be minimum nether 1 nor 2 both 1 and 2 Rated voltage and frequency has to be supplied to the consumers Cost of electrical energy per KWh is to be minimum nether 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows : Ipositive = j1.5 pu, Inegative = − j0.5 pu, Izero = − j pu Which fault is this? LLLG. LL. LLG. LG. LLLG. LL. LLG. LG. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Ash handling unit. Pulversing unit. Cooling tower. Condenser. Ash handling unit. Pulversing unit. Cooling tower. Condenser. ANSWER DOWNLOAD EXAMIANS APP