Power Systems In thermal plant most of the energy is wasted in condenser turbines ESP boiler condenser turbines ESP boiler ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Gas turbine. Hydro Power Plant Thermal. Nuclear. Gas turbine. Hydro Power Plant Thermal. Nuclear. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For symmetrical network, the neutral current is zero any of the above infinity maximum zero any of the above infinity maximum ANSWER DOWNLOAD EXAMIANS APP
Power Systems A coal fired steam power station working at a plant factor of 80% has one 500 MW generating unit. If the heat content of coal is 2 kWh/kg, the overall plant efficiency is 40% and a train load of coal is 2000 metric tons, then the number of trains required daily for the plant is 6 10 2 16 6 10 2 16 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The skin effect shows that current density is more at the centre of the condutor the distribution of AC current is uniform through the cross section of the conductor current density is lower at the surface of the condutor current density is more at the surface of the condutor current density is more at the centre of the condutor the distribution of AC current is uniform through the cross section of the conductor current density is lower at the surface of the condutor current density is more at the surface of the condutor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Stock bridge dampers are used to increase the sag reduce the vibrations at the point of support All of these reduce the tension increase the sag reduce the vibrations at the point of support All of these reduce the tension ANSWER DOWNLOAD EXAMIANS APP