In thermal plant most of the energy is wasted in

 turbines
 ESP
 boiler
 condenser

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
What are the methods of laying underground cables?

  Both A and B.
 Direct laying.
 None of these.
 Draw - in - system / duct - pipe laying.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Mho relay is usually employed for protection of

 short transmission lines only
 long transmission lines only
 any line
 medium transmission lines only

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If the conductor diameter decreases, inductance of the line,

 decreases
None of these
 remains unaffected
 increases

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The voltage regulation of a line at full load 0.8 power factor is 11. A long transmission line under no load conditions, for a good voltage profile needs

 shunt reactor at receiving end
All of these
 shunt resistance at receiving end
 shunt capacitor at receiving end

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 10 MVA generator has reactance of 0.2 pu. Find the new reactance value for 50 MVA base?

 0.25 pu
 1 pu
 5 pu
 0.2 pu

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑