Power Systems In thermal plant most of the energy is wasted in condenser ESP turbines boiler condenser ESP turbines boiler ANSWER DOWNLOAD EXAMIANS APP
Power Systems To improve the efficiency of thermal power plant ________________ is placed between boiler and turbine. economizer. air preheater. superheater. ash handling point. economizer. air preheater. superheater. ash handling point. ANSWER DOWNLOAD EXAMIANS APP
Power Systems On a power system network the load is increasing represents the value of impedance remains constant. none of above. increase. decrease. remains constant. none of above. increase. decrease. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An ACSR conductor has a diameter of 2 cm has internal inductance of 0.05 mH/Km. If this ACSR is replaced with another having a diameter of 4 cm then its internal inductance is 0.05 mH/Km 0.025 mH/Km 0 mH/Km 0.1 mH/Km 0.05 mH/Km 0.025 mH/Km 0 mH/Km 0.1 mH/Km ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Condenser. Cooling tower. Ash handling unit. Pulversing unit. Condenser. Cooling tower. Ash handling unit. Pulversing unit. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The insulator thickness on the conductor, in cables depends upon power factor current voltage reactive power power factor current voltage reactive power ANSWER DOWNLOAD EXAMIANS APP