Power Systems

Power Systems
In thermal plant most of the energy is wasted in

 ESP
 condenser
 turbines
 boiler

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
At slack bus, which one of the following combinations of variables is not specified?

 V and δ
 Q and V
 P and Q
 P and V

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
On a power system network the load is increasing represents the value of impedance

  increase.
  remains constant.
  decrease.
  none of above.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
MCB stands for

  maximum capacity breaker.
  molded circuit breaker.
  miniature circuit breaker.
  minimum capacity breaker.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Under over excitation synchronous phase modifier works as

 series capacitor
 shunt reactor
 any of the above
 shunt capacitor

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If we increase the length of the transmission line, the charging current

None of these
 increases
 remains unaffected
 decreases

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑