Power Systems In thermal plant most of the energy is wasted in ESP boiler condenser turbines ESP boiler condenser turbines ANSWER DOWNLOAD EXAMIANS APP
Power Systems For 132 kV system, the reactance and capacitance up to the location of the CB is 3 Ω and 0.015 μF respectively. The maximum value of RRRV is 9.01 kV / μs. 12.2 kV / μs. 2.0 kV / μs. 10.01 kV / μs. 9.01 kV / μs. 12.2 kV / μs. 2.0 kV / μs. 10.01 kV / μs. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The conductor of a 10 Km long single phase, two wire line are separated by a distance of 1.5 m the diameter of each conductor the inductance of the circuit is 21.2 mH. 23.33 mH. 25.8 mH. 23.8 mH. 21.2 mH. 23.33 mH. 25.8 mH. 23.8 mH. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following contributes to the Rankine cycle efficiency improvement in a thermal power plant Use of steam for heating of boiler feed water. Use of high pressure. All of these Reheat of steam an intermediate stages. Use of steam for heating of boiler feed water. Use of high pressure. All of these Reheat of steam an intermediate stages. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The line current IR flowing into balanced delta connected load is - j5 - 3 A. If the phase sequence is RYB the phase current IYB is 10. 55.1. 20. 5. 10. 55.1. 20. 5. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the inertia constant H = 10 MJ/MVA for a 50 MVA generator, the stored energy is 5 MJ 500 MJ 10 MJ 50 MJ 5 MJ 500 MJ 10 MJ 50 MJ ANSWER DOWNLOAD EXAMIANS APP