Power Systems Corona loss is ----------------- on hilly areas than as plain areas. less remain same None of these more less remain same None of these more ANSWER DOWNLOAD EXAMIANS APP
Power Systems The water from a catchment is 60*106 cu m annually and hydro station has head of 40 m. Assuming ideal generator and turbine, the power that can be theoretically generated is 250 kW 750 kW 500 kW 300 kW 250 kW 750 kW 500 kW 300 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠90° Ω, C = 0.5*10-6∠90° â„§. Find the no load receiving end voltage? 400 kV 500 kV 320 kv 600 kV 400 kV 500 kV 320 kv 600 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which following statement are not true for line parameters R, L, G and C of transmission line LC = μ ε and RG = σ ε. G = 1/R where G is conductance of line. All of above. Both R and G depend on the conductivity of conductor forming the line. LC = μ ε and RG = σ ε. G = 1/R where G is conductance of line. All of above. Both R and G depend on the conductivity of conductor forming the line. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The economics of power plant is greatly influenced by diversity factor nether 1 nor 2 both 1 and 2 load factor diversity factor nether 1 nor 2 both 1 and 2 load factor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Alternate formation and breakage of bubbles are called surgfication. cavitations. All of these water hamming. surgfication. cavitations. All of these water hamming. ANSWER DOWNLOAD EXAMIANS APP