Power Systems Which of the following will take least time in starting from cold condition to full load operation Nuclear power plant. Thermal power plant. Gas turbine plant. Hydro electric power plant. Nuclear power plant. Thermal power plant. Gas turbine plant. Hydro electric power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems As the frequency of the system is increased, the charging MVAR increases remains unaffected None of these decreases increases remains unaffected None of these decreases ANSWER DOWNLOAD EXAMIANS APP
Power Systems A CANDU reactor uses enriched uranium as fuel and ordinary water as moderator and cooler. only fertile materials. natural uranium as fuel and heavy water as moderator and coolant. highly enriched uranium as fuel and water as moderator and coolant. enriched uranium as fuel and ordinary water as moderator and cooler. only fertile materials. natural uranium as fuel and heavy water as moderator and coolant. highly enriched uranium as fuel and water as moderator and coolant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. If the load factor is 0.8. Find the reserve capacity of the station? 18 MW 9 MW 5 MW 10 MW 18 MW 9 MW 5 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Nuclear. Gas-turbine. Thermal. Hydro Power Plant Nuclear. Gas-turbine. Thermal. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase, 110 kV coaxial XLPE insulated power cable delivering power at 50 Hz, has a capacitance of 125 nF/km. If the dielectric loss tangent of XLPE is 2*10^-4, then dielcetric power loss in this cable in W/km/phase is 31.7 23.9 35.45 38.6 31.7 23.9 35.45 38.6 ANSWER DOWNLOAD EXAMIANS APP