Power Systems Which of the following will take least time in starting from cold condition to full load operation Nuclear power plant. Hydro electric power plant. Gas turbine plant. Thermal power plant. Nuclear power plant. Hydro electric power plant. Gas turbine plant. Thermal power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Merze price current scheme protection is used in bus bars. alternator. both A and B. transformer. bus bars. alternator. both A and B. transformer. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Thermal shielding is provided to All of these absorb the fast neutron. prevent the reactor wall from getting heated. protected the operating personal from exposure to radiations. All of these absorb the fast neutron. prevent the reactor wall from getting heated. protected the operating personal from exposure to radiations. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The insulation resistance of the 20 km long underground cable is 8 MΩ. Other things being same, the insulation resistance of 10 km long cable will be 4 MΩ 32 MΩ 16 MΩ 8 MΩ 4 MΩ 32 MΩ 16 MΩ 8 MΩ ANSWER DOWNLOAD EXAMIANS APP
Power Systems If skin depth is more, then skin effect is either 1 or 2 less None of these more either 1 or 2 less None of these more ANSWER DOWNLOAD EXAMIANS APP
Power Systems If a fault occurs on any feeder, the fault current is none of these. much higher than with unsectional bus bar. equal to unsectional bus bar. much lower than with unsectional bus bar. none of these. much higher than with unsectional bus bar. equal to unsectional bus bar. much lower than with unsectional bus bar. ANSWER DOWNLOAD EXAMIANS APP