Power Systems Which of the following will take least time in starting from cold condition to full load operation Nuclear power plant. Gas turbine plant. Thermal power plant. Hydro electric power plant. Nuclear power plant. Gas turbine plant. Thermal power plant. Hydro electric power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 100 Km long transmission line is loaded at 110 kV. If the loss of line is 5 MW and the load is 150 VA the resistance of the line is 4.65 Ω / phase. 2.26 Ω / phase. 8.06 Ω / phase. 6.06 Ω / phase. 4.65 Ω / phase. 2.26 Ω / phase. 8.06 Ω / phase. 6.06 Ω / phase. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An alternator having an induced emf of 1.6 pu is connected to an infinite bus of 1 pu. If the bus bar has reactance of 0.6 pu and alternator has reactance of 0.2 pu, what is the maximum power that can be transferred? 2.67 pu 5 pu 6 pu 2 pu 2.67 pu 5 pu 6 pu 2 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Area under the daily curve divided by 24 gives average load units generated maximum load maximum demand average load units generated maximum load maximum demand ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Ash handling unit. Pulversing unit. Condenser. Cooling tower. Ash handling unit. Pulversing unit. Condenser. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Graphite is use din nuclear plant as a / an coolant. fuel. moderator. electrode. coolant. fuel. moderator. electrode. ANSWER DOWNLOAD EXAMIANS APP