Power Systems Which of the following will take least time in starting from cold condition to full load operation Hydro electric power plant. Thermal power plant. Gas turbine plant. Nuclear power plant. Hydro electric power plant. Thermal power plant. Gas turbine plant. Nuclear power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ABCD constants of a 3-phase transmission line are A = D = 0.8∠1°, B = 170∠85° Ω , C = 0.002∠90.4° â„§. The sending end voltage is 400 kV. The receiving end voltage under no load condition is 600 kV 350 kV 500 kV 400 kV 600 kV 350 kV 500 kV 400 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems Based on the discharge, Kaplan turbine will discharge 1000 lpm >10000 lpm 1000 lpm >10000 lpm ANSWER DOWNLOAD EXAMIANS APP
Power Systems A network containing 50 buses in which 10 are the voltage control buses, 6 are the generator buses. Find the size of the Jacobian matrix? 84*84 83*83 34*34 33*33 84*84 83*83 34*34 33*33 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The conductor carries more current on surface as compared to core. This is called as corona effect unsymmetrical fault All of these skin effect corona effect unsymmetrical fault All of these skin effect ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase breaker is rated at 2000 MVA, 33 kV, its making current will be 89.22 kVA. 70 kVA. 35 kVA. 49 kVA. 89.22 kVA. 70 kVA. 35 kVA. 49 kVA. ANSWER DOWNLOAD EXAMIANS APP