Power Systems Which of the following will take least time in starting from cold condition to full load operation Nuclear power plant. Thermal power plant. Gas turbine plant. Hydro electric power plant. Nuclear power plant. Thermal power plant. Gas turbine plant. Hydro electric power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A coal fired steam power station working at a plant factor of 80% has one 500 MW generating unit. If the heat content of coal is 2 kWh/kg, the overall plant efficiency is 40% and a train load of coal is 2000 metric tons, then the number of trains required daily for the plant is 2 6 10 16 2 6 10 16 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of gauss siedel method is/are applicable for large power system network calculation time for each iteration is less number of iterations are less All of these applicable for large power system network calculation time for each iteration is less number of iterations are less All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where air circuit breakers are used? Up to 12 kV. Up to 33 kV. Up to 11 kV. Up to 66 kV. Up to 12 kV. Up to 33 kV. Up to 11 kV. Up to 66 kV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The corona loss on a particular system at 60 Hz is 1 kW/km per phase. What is the corona loss at 50 Hz in kW/km per phase? 1.13 0.93 0.882 1 1.13 0.93 0.882 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power. Find the load angle? 45° 35° 60° 30° 45° 35° 60° 30° ANSWER DOWNLOAD EXAMIANS APP