Power Systems
Where is the draft tube of a hydroelectric plant that is an airtight pipe located

 At the beginning of the penstock.
 Near the surge tank.
  In between the penstock and runner.
 In between the runner exhaust and the tail race.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The incremental fuel costs for two generating units G1 and G2 are given by Ic1 = 25 + 0.2 PG1 and Ic2 = 32 + 0.2 PG2, where PG1 and PG2 are real powers generated by the units. The economic allocation for a total load of 250 MW, neglecting transmission loss, is given by

 PG1 = 125 MW and PG2 = 125 MW
 PG1 = 109.75 MW and PG2 = 140.25 MW
 PG1 = 142.5 MW and PG2 = 107.5 MW
 PG1 = 100 MW and PG2 = 150 MW

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
An hydro-graph indicates

 the maximum and minimum run off during the period.
 the discharge at any time during the period under consideration.
 the average run off during the period.
All of these