Power Systems A hydroelectric power station is commonly found in swamps. grasslands. hilly areas. desert areas. swamps. grasslands. hilly areas. desert areas. ANSWER DOWNLOAD EXAMIANS APP
Power Systems On which one of the following cycles does a modern steam power plat work Bell - Coleman cycle. Carnot cycle. Otto cycle. Rankine cycle. Bell - Coleman cycle. Carnot cycle. Otto cycle. Rankine cycle. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading can be increased by increasing of capacitance value both 1 and 2 increasing of inductance value increasing of voltage level increasing of capacitance value both 1 and 2 increasing of inductance value increasing of voltage level ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 60 Hz, 320 Km loss less line has sending end voltage 1.0 pu. The receiving end voltage on no-load is none of these. 1.116 pu. 1.088 pu. 1.1 pu. none of these. 1.116 pu. 1.088 pu. 1.1 pu. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage regulation of a line at full load 0.8 power factor is 11. A long transmission line under no load conditions, for a good voltage profile needs All of these shunt capacitor at receiving end shunt reactor at receiving end shunt resistance at receiving end All of these shunt capacitor at receiving end shunt reactor at receiving end shunt resistance at receiving end ANSWER DOWNLOAD EXAMIANS APP
Power Systems In which of the following given faults, all the sequence currents are equal? LL LLL LG LLG LL LLL LG LLG ANSWER DOWNLOAD EXAMIANS APP