Power Systems A hydroelectric power station is commonly found in hilly areas. swamps. desert areas. grasslands. hilly areas. swamps. desert areas. grasslands. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 1250 MW 750 MW 500 MW 250 MW 1250 MW 750 MW 500 MW 250 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following are the fertile materials U233 and Pu239. U238 and Th232. U238 and Th239. U238 and Pu239. U233 and Pu239. U238 and Th232. U238 and Th239. U238 and Pu239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with high percentage of reaction and runner adjust vanes is Kaplan. Impeller. Francis. Pelton. Kaplan. Impeller. Francis. Pelton. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the characteristic impedance of a transmission line, if impedance is 16 Ω and admittance is 0.1 m℧? 200 Ω 320 Ω 160 Ω 400 Ω 200 Ω 320 Ω 160 Ω 400 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following plants is/are base load plants run off river nuclear pump storage both 1 and 2 run off river nuclear pump storage both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP