Power Systems In which of the following given faults, all the sequence currents are equal? LLL LG LLG LL LLL LG LLG LL ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following insulator is practically used for railway crossings? string insulator strain insulator All of these pin insulator string insulator strain insulator All of these pin insulator ANSWER DOWNLOAD EXAMIANS APP
Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Load duration curve. Monograph. Hydro-graph. Hectograph. Load duration curve. Monograph. Hydro-graph. Hectograph. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 2 × 106 kV / sec. 3 × 106 kV / sec. 1 × 106 kV / sec. 3.5 × 106 kV / sec. 2 × 106 kV / sec. 3 × 106 kV / sec. 1 × 106 kV / sec. 3.5 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When reactance grounding is used in network, the voltage between neutral and ground is both 1 and 3 IR0 × Xn IN × Xn 3×IR0 × Xn both 1 and 3 IR0 × Xn IN × Xn 3×IR0 × Xn ANSWER DOWNLOAD EXAMIANS APP
Power Systems A load centre is at an equidistant from the two thermal generating stations G1 and G2. The fuel cost characteristics of the generating stations are given by F1 = a + bP1 + cP²1 F2 = a + b P2 + 2cP²2 Where P1 and P2 are the generation in MW of G1 and G2, respectively. For most economic generation to meet 300 MW of load, P1 and P2 respectively, are 175, 125 100, 200 150, 150 200, 100 175, 125 100, 200 150, 150 200, 100 ANSWER DOWNLOAD EXAMIANS APP