Power Systems Pelton wheel turbine is a low head turbine. high head turbine. medium head turbine. none of above. low head turbine. high head turbine. medium head turbine. none of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When is the ferranti effect on long overhead lines experienced? The line is fully loaded The power factor is unity The line is heavily loaded The line is lightly loaded The line is fully loaded The power factor is unity The line is heavily loaded The line is lightly loaded ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has surge impedance of 400 Ω, operating at Vs = Vr = 400 kV line is compensated with a shunt capacitance of 30%. Find the surge impedance loading with compensation? 386 MW 456 MW 478 MW 400 MW 386 MW 456 MW 478 MW 400 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 100 MVA alternator operating at full load at 50 Hz. H = 4 MWsec/MVA, Td = 0.5 sec. One of the transmission line is tripped. So that output of generator is reduced to 70 MW. Find the frequency deviation during this time? 0.56 0.92 -0.92 -0.56 0.56 0.92 -0.92 -0.56 ANSWER DOWNLOAD EXAMIANS APP
Power Systems a 50 Hz, 3-phase synchronous generator has inductance per phase of 15 mH. The capacitance of the generator and circuit breaker is 0.002 µF. What is its natural frequency? 2.9 kHz 29 MHz 290 kHz 29 kHz 2.9 kHz 29 MHz 290 kHz 29 kHz ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydro power stations what is an enlarged body of water just above the intake and used as a regulating reservoir called Spillways. Reservoir. Penstock. Fore bay. Spillways. Reservoir. Penstock. Fore bay. ANSWER DOWNLOAD EXAMIANS APP