• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
For symmetrical network, the neutral current is

 maximum
 any of the above
 zero
 infinity

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Fault calculations using computer are usually done by

None of these
 Y bus method
 Z bus method
 either 1 or 2

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following is not a secondary nuclear fuel

 U233.
 None of above.
 Pu239.
  U235.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
What is the total installed power capacity (MW) in West Bengal as published by ministry of power in 2011?

 6114.05.
 15515.22.
 10000.32.
 8113.27.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Offset mho relay is used for the protection of equipment when

 loss of excitation of the generator
 either 1 or 2
None of these
 failure of prime mover of the generator

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A hydraulic turbine having rated speed of 250 rpm is connected to a synchronous generator. In order to produce power at 50 Hz, the numbers of pole are required in the generator

 16.
 12.
 6.
  24.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑