Power Systems Which of the following is not a secondary nuclear fuel Pu239. U235. U233. None of above. Pu239. U235. U233. None of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 3.5 × 106 kV / sec. 3 × 106 kV / sec. 2 × 106 kV / sec. 1 × 106 kV / sec. 3.5 × 106 kV / sec. 3 × 106 kV / sec. 2 × 106 kV / sec. 1 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The incremental fuel costs for two generating units G1 and G2 are given by Ic1 = 25 + 0.2 PG1 and Ic2 = 32 + 0.2 PG2, where PG1 and PG2 are real powers generated by the units. The economic allocation for a total load of 250 MW, neglecting transmission loss, is given by PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 100 MW and PG2 = 150 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Monograph. Hydro-graph. Hectograph. Load duration curve. Monograph. Hydro-graph. Hectograph. Load duration curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following are the fissile materials U235 and Th239. U235, U233 and Pu239. U238 and Th232. None of these. U235 and Th239. U235, U233 and Pu239. U238 and Th232. None of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Nuclear. Hydro Power Plant Thermal. Gas turbine. Nuclear. Hydro Power Plant Thermal. Gas turbine. ANSWER DOWNLOAD EXAMIANS APP