Power Systems The function of draft tube is reaction turbine is to increase flow rate of water. convert kinetic energy of water. reduce water hammer. all of above. increase flow rate of water. convert kinetic energy of water. reduce water hammer. all of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 3 × 106 kV / sec. 3.5 × 106 kV / sec. 1 × 106 kV / sec. 2 × 106 kV / sec. 3 × 106 kV / sec. 3.5 × 106 kV / sec. 1 × 106 kV / sec. 2 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power station needs space less than that required by the diesel power station of same output. less than that required by a gas turbine power plant of same output. less than that required by hydro-power station of same capacity. less than that required by atomic power station of the same output. less than that required by the diesel power station of same output. less than that required by a gas turbine power plant of same output. less than that required by hydro-power station of same capacity. less than that required by atomic power station of the same output. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading can be increased by increasing of inductance value increasing of capacitance value increasing of voltage level both 1 and 2 increasing of inductance value increasing of capacitance value increasing of voltage level both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Thermal. Nuclear. Hydro Power Plant Gas turbine. Thermal. Nuclear. Hydro Power Plant Gas turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 4*4 Y bus matrix the number of non zero elements are 12. Find the sparsity of the system? 0.75 0.5 0.25 1 0.75 0.5 0.25 1 ANSWER DOWNLOAD EXAMIANS APP