Power Systems What is the total installed power capacity (MW) in West Bengal as published by ministry of power in 2011? 6114.05. 8113.27. 15515.22. 10000.32. 6114.05. 8113.27. 15515.22. 10000.32. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the methods of laying underground cables? Draw - in - system / duct - pipe laying. None of these. Direct laying. Both A and B. Draw - in - system / duct - pipe laying. None of these. Direct laying. Both A and B. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Condition for maximum voltage regulation tanφ = X/R cosφ = R/X cosφ = X/R tanφ = R/X tanφ = X/R cosφ = R/X cosφ = X/R tanφ = R/X ANSWER DOWNLOAD EXAMIANS APP
Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 400/5. The pick up value is 6.25 A 15 A 12.5 A 10 A 6.25 A 15 A 12.5 A 10 A ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MVA alternator operated at no load at frequency of 50 Hz, it has inertia constant of 5 MWsec/MVA and governing system has a time delay of 0.6 sec. If the load of 50 MW is suddenly applied then find the frequency deviation during this time? 0.85 Hz -0.76 Hz 0.76 Hz -0.85 Hz 0.85 Hz -0.76 Hz 0.76 Hz -0.85 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power planets is the least reliable Geothermal. Solar. Tidal. Wind. Geothermal. Solar. Tidal. Wind. ANSWER DOWNLOAD EXAMIANS APP