Power Systems What is the total installed power capacity (MW) in West Bengal as published by ministry of power in 2011? 10000.32. 6114.05. 8113.27. 15515.22. 10000.32. 6114.05. 8113.27. 15515.22. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The value of inductance used for compensation of arcing grounds is 3ω²C ω²C/3 1/3ω²C 3/ω²C 3ω²C ω²C/3 1/3ω²C 3/ω²C ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of shunt compensation is/are single unit can be used as both capacitance and inductor by adjusting the excitation smooth voltage regulation is possible by controlling excitation All of these It requires less maintanance single unit can be used as both capacitance and inductor by adjusting the excitation smooth voltage regulation is possible by controlling excitation All of these It requires less maintanance ANSWER DOWNLOAD EXAMIANS APP
Power Systems A fuse wire of circular cross-section has a radius of 0.8 mm. The wire blows off at an current of 8 Amp. Calculate the radius of wire that will blow off at an current of 1 amp? 4 mm. 2 mm. 0.2 mm. 0.4 mm. 4 mm. 2 mm. 0.2 mm. 0.4 mm. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Condenser. Pulversing unit. Cooling tower. Ash handling unit. Condenser. Pulversing unit. Cooling tower. Ash handling unit. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. If the load factor is 0.8. Find the reserve capacity of the station? 5 MW 10 MW 18 MW 9 MW 5 MW 10 MW 18 MW 9 MW ANSWER DOWNLOAD EXAMIANS APP