Power Systems What is the total installed power capacity (MW) in West Bengal as published by ministry of power in 2011? 6114.05. 15515.22. 8113.27. 10000.32. 6114.05. 15515.22. 8113.27. 10000.32. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A Pelton wheel turbine having a rated speed of 300 rpm is connected to an alternator to produce power at 50 Hz. The number of poles required in the alternator is 8 20 4 10 8 20 4 10 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydroelectric power station is commonly found in grasslands. swamps. hilly areas. desert areas. grasslands. swamps. hilly areas. desert areas. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ABCD constants of a 3-phase transmission line are A = D = 0.8∠1°, B = 170∠85° Ω , C = 0.002∠90.4° â„§. The sending end voltage is 400 kV. The receiving end voltage under no load condition is 350 kV 600 kV 500 kV 400 kV 350 kV 600 kV 500 kV 400 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems A coal fired steam power station working at a plant factor of 80% has one 500 MW generating unit. If the heat content of coal is 2 kWh/kg, the overall plant efficiency is 40% and a train load of coal is 2000 metric tons, then the number of trains required daily for the plant is 10 16 2 6 10 16 2 6 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has surge impedance of 400 Ω, operating at Vs = Vr = 400 kV line is compensated with a shunt capacitance of 30%. The line is connected to a generator delivering 200 MW. Find the load angle with out and with compensation respectively? 30° and 45° 45° and 26° 30° and 26° 26° and 30° 30° and 45° 45° and 26° 30° and 26° 26° and 30° ANSWER DOWNLOAD EXAMIANS APP