The value of inductance used for compensation of arcing grounds is

 ω²C/3
 3ω²C
 1/3ω²C
 3/ω²C

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called

  damping time.
  coasting time.
  stopping time.
  settling time.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Maximum power capacity of a transmission line can be increased by

 nether 1 nor 2
 either 1 or 2
 increasing voltage level
 decreasing reactance value

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If sag in an overhead line increase, tension in the line

 remains same
 increase
None of these
 decrease

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The steam power plant efficiency can be improved by

 using large quantity of water.
 decreasing the load on the plant.
 burning large amount of coal.
  using high temperature and high pressure steam.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If we increase the length of the transmission line, the charging current

 increases
 remains unaffected
 decreases
None of these

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑