Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 7. 3. 5. 20. 7. 3. 5. 20. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 100 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 20 MW 80 MW 15 MW 10 MW 20 MW 80 MW 15 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following statement are false In a nuclear reactor, multiplication factor is kept almost equal to one. Nuclear power plants are used as peak load plants only. A thermal reactor needs a moderator material. In nuclear power plants, chain reaction is controlled by cadmium rods. In a nuclear reactor, multiplication factor is kept almost equal to one. Nuclear power plants are used as peak load plants only. A thermal reactor needs a moderator material. In nuclear power plants, chain reaction is controlled by cadmium rods. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠90° Ω, C = 0.5*10-6∠90° â„§. Find the no load receiving end voltage? 400 kV 320 kv 600 kV 500 kV 400 kV 320 kv 600 kV 500 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power transfer capability of transmission line can be increased by Using bundled conductors All of these Parallel transmission lines Using series capacitance Using bundled conductors All of these Parallel transmission lines Using series capacitance ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 1-phase transmission line has an impedance (4 + 3j ) Ω. Find the power factor of the load for zero voltage regulation? 0.8 lead 0.6 lead 0.8 lag 0.6 lag 0.8 lead 0.6 lead 0.8 lag 0.6 lag ANSWER DOWNLOAD EXAMIANS APP