Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 3. 20. 5. 7. 3. 20. 5. 7. ANSWER DOWNLOAD EXAMIANS APP
Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Load duration curve. Hydro-graph. Monograph. Hectograph. Load duration curve. Hydro-graph. Monograph. Hectograph. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 100 Km long transmission line is loaded at 110 kV. If the loss of line is 5 MW and the load is 150 VA the resistance of the line is 2.26 Ω / phase. 8.06 Ω / phase. 4.65 Ω / phase. 6.06 Ω / phase. 2.26 Ω / phase. 8.06 Ω / phase. 4.65 Ω / phase. 6.06 Ω / phase. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power. Find the load angle? 60° 30° 45° 35° 60° 30° 45° 35° ANSWER DOWNLOAD EXAMIANS APP
Power Systems An ACSR conductor has internal inductance 0.05 mH/Km for µr = 1. If this ACSR is replaced with another having µr = 2, then find the internal inductance? 0.05 mH/Km 0.1 mH/Km 0 mH/Km 0.025 mH/Km 0.05 mH/Km 0.1 mH/Km 0 mH/Km 0.025 mH/Km ANSWER DOWNLOAD EXAMIANS APP
Power Systems The annual depreciation of hydro power plant is about 0.5 - 1.5 %. 10 - 15 %. 20 - 25 %. 15 - 20 %. 0.5 - 1.5 %. 10 - 15 %. 20 - 25 %. 15 - 20 %. ANSWER DOWNLOAD EXAMIANS APP