Power Systems

Power Systems
If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs.

 3.
  5.
 20.
 7.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Maximum power transfer capability of transmission line can be increased by

 Using series capacitance
 Parallel transmission lines
All of these
 Using bundled conductors

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power. Find the load angle?

 30°
 45°
 60°
 35°

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Length of short transmission line is up to

 150 km
 any of the above
 80 km
 40 km

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Out of the following plant categories which is not the base load power plant?

 Diesel.
  Pump storage.
 Run of river.
 Nuclear.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Peterson coil is used in case of transmission line for

 improve power factor
 compensation of arcing grounds
 increase the voltage level
 reduce ferranti effect

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑