If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs.

 20.
 3.
  5.
 7.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 400/5. The pick up value is

 6.25 A
 12.5 A
 15 A
 10 A

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a 400 KV network, 360 KV is recorded at a 400 KV bus. The reactive power absorbed by shunt rated for 50 MVAr, 400 KV connected at the bus is

 61.73 MVAr.
 55.56 MVAr.
 45 MVAr.
  40.5 MVAr.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following contributes to the Rankine cycle efficiency improvement in a thermal power plant

All of these
 Use of high pressure.
 Reheat of steam an intermediate stages.
 Use of steam for heating of boiler feed water.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Maximum power capacity of a transmission line can be increased by

 decreasing reactance value
 increasing voltage level
 either 1 or 2
 nether 1 nor 2

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In thermal plant most of the energy is wasted in

 condenser
 boiler
 ESP
 turbines

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑