Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 5. 20. 7. 3. 5. 20. 7. 3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station supplies the peak load of 50 MW, 40 MW and 70 MW to three localities. The annual load factor is 0.50 p.u. and the diversity factor of the load at the station is 1.55 the maximum demand on the station and average load respectively will be 57.5 MW. 51.61 MW. 53 MW. 52 MW. 57.5 MW. 51.61 MW. 53 MW. 52 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ferranti effect occurs under half load full load any of the above no load half load full load any of the above no load ANSWER DOWNLOAD EXAMIANS APP
Power Systems Operating time of pumped storage plant is can't say low very high high can't say low very high high ANSWER DOWNLOAD EXAMIANS APP
Power Systems The insulation of modern EHV is designed based on corona. switching voltage. lightning voltage. RI. corona. switching voltage. lightning voltage. RI. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with high percentage of reaction and runner adjust vanes is Pelton. Kaplan. Francis. Impeller. Pelton. Kaplan. Francis. Impeller. ANSWER DOWNLOAD EXAMIANS APP