If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs.

 3.
 20.
  5.
 7.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
With reference to hydrometer station, the graphical representation of the discharge as function of time is known as

 Load duration curve.
  Hydro-graph.
 Monograph.
 Hectograph.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 100 Km long transmission line is loaded at 110 kV. If the loss of line is 5 MW and the load is 150 VA the resistance of the line is

 2.26 Ω / phase.
  8.06 Ω / phase.
 4.65 Ω / phase.
 6.06 Ω / phase.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A transmission line has a reactance of 1 Pu is operating at Vs = Vr = 1 Pu. The generator is connected at source end which is delivering 0.5 Pu of active power. Find the load angle?

 60°
 30°
 45°
 35°

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
An ACSR conductor has internal inductance 0.05 mH/Km for µr = 1. If this ACSR is replaced with another having µr = 2, then find the internal inductance?

 0.05 mH/Km
 0.1 mH/Km
 0 mH/Km
 0.025 mH/Km

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The annual depreciation of hydro power plant is about

  0.5 - 1.5 %.
 10 - 15 %.
 20 - 25 %.
 15 - 20 %.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑