Power Systems

Power Systems
If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs.

  5.
 7.
 3.
 20.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The pickup value of relay is 6.5 Amp and fault current in relay coil is 39 Amp. Its plug setting multiplier is

 10 A.
  6 A.
 7 A.
 8 A.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Isolator in sub station is open under ------------- condition?

 any of the above
 full load
 short circuit
 no load

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following effects are associated with transmission line

All of these
 skin effect
 corona effect
 ferranti effect

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Operating time of pumped storage plant is

 low
 can't say
 high
 very high

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
For 66 kV lines the number of insulator discs of each 11 kV used are

 6
 3
 5
 12

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑