If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs.

 20.
  5.
 3.
 7.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The line current IR flowing into balanced delta connected load is - j5 - 3 A. If the phase sequence is RYB the phase current IYB is

 55.1.
 20.
  5.
 10.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The positive (Z1), negative (Z2) and zero sequence (Z0) impedances of a transmission line follows the relation

 any of the above
 Z1 = Z2 = Z0
 (Z1 = Z2) > Z0
 (Z1 = Z2) < Z0

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In which of the following configuration power transferability is higher?

 triangular configuration
 horizontal configuration
None of these
 same in both configuration

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
What is the correct expression for the electrical power developed by

 ( 75 / 0.736 ) × WQHη.
 75 × 0.736 × WQHη.
 ( 7 / 75 ) × WQHη.
  ( 0.763 / 75 ) × WQHη.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The Y bus matrix of 100 bus interconnected system is 90% sparse. Hence the number of transmission lines in the system must be

 500
 250
 900
 450

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑