Power Systems

Power Systems
If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs.

  5.
 7.
 20.
 3.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The essential requirement(s) for power plants to be operated as peak load plants are

All of these
 Capability of quick starts.
 Low capital cost.
 Quick response to load variation.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
How much KWh energy is produced by fission of 1 gm of uranium U235

  24 kWh.
 2400 kWh.
 240 kWh.
  24000 kWh.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following transformer is used in sub station for operating a protective relay?

All of these
 auto transformer
 capacitor voltage transformer
 distribution transformer

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 1- phase transmission line operating at 30 kV has radius of 1 cm and distance between conductors is 0.5 m. Assume m = δ =1, g = 21 kV/cm and frequency f = 50 Hz. Find the critical disruptive voltage?

 17.32 kV/phase
 82.15 kV/phase
 41.075 kV/phase
 34.64 kV/phase

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Mho relays are used for the protection of which of the following lines?

None of these
 medium transmission lines only
 long transmission lines only
 short transmission lines only

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑