Power Systems

Power Systems
If the fault is very nearer to the generator, the fault current is

 any of the above
 zero
 larger
 less

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called

  stopping time.
  damping time.
  settling time.
  coasting time.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The conversion ratio of breeder reactor are

 less than 1.
 none of above.
 1.
  greater than 1.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The Y bus matrix of 100 bus interconnected system is 90% sparse. Hence the number of transmission lines in the system must be

 500
 250
 450
 900

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be

 7.936 pu
 9.936 pu
 10.936 pu
 8.936 pu

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Surge impedance loading (SIL) is represented by

 both 1 and 2
 Vph²/Zs
 Vl²/Zs
 Vl²*√(C/L)

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑