Power Systems Proximity effect is more in case of same in both cases None of these power cables over head lines same in both cases None of these power cables over head lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems The equation of area control error(ACE) is ACE = ΔPtie - b.Δf ACE = ΔPtie +1/ b.Δf ACE = ΔPtie - 1/b.Δf ACE = ΔPtie + b.Δf ACE = ΔPtie - b.Δf ACE = ΔPtie +1/ b.Δf ACE = ΔPtie - 1/b.Δf ACE = ΔPtie + b.Δf ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows : Ipositive = j1.5 pu, Inegative = − j0.5 pu, Izero = − j pu Which fault is this? LL. LLG. LG. LLLG. LL. LLG. LG. LLLG. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The essential requirement(s) for power plants to be operated as peak load plants are Low capital cost. Capability of quick starts. All of these Quick response to load variation. Low capital cost. Capability of quick starts. All of these Quick response to load variation. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A loss less transmission line has a length of 600 km, find the phase shift of voltage signal? 42° 36° 90° 45° 42° 36° 90° 45° ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the correct expression for the electrical power developed by ( 7 / 75 ) × WQHη. ( 75 / 0.736 ) × WQHη. ( 0.763 / 75 ) × WQHη. 75 × 0.736 × WQHη. ( 7 / 75 ) × WQHη. ( 75 / 0.736 ) × WQHη. ( 0.763 / 75 ) × WQHη. 75 × 0.736 × WQHη. ANSWER DOWNLOAD EXAMIANS APP