Power Systems The advantage of hydro electric power station over thermal power station is hydro electric station can be constructed at the place where the energy is required the initial cost of hydro electric power station is low hydro electric power station can supply the power throughout the year the operation cost of hydro electric power station is low hydro electric station can be constructed at the place where the energy is required the initial cost of hydro electric power station is low hydro electric power station can supply the power throughout the year the operation cost of hydro electric power station is low ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the methods of laying underground cables? Direct laying. Draw - in - system / duct - pipe laying. Both A and B. None of these. Direct laying. Draw - in - system / duct - pipe laying. Both A and B. None of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The internal flux linkage due to internal flux of a conductor is I/4*10-7 wb-T/m I/6*10-7 wb-T/m All of these I/2*10-7 wb-T/m I/4*10-7 wb-T/m I/6*10-7 wb-T/m All of these I/2*10-7 wb-T/m ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generator has reactances of sub transient (X")= 0.5 pu, transient (X') = 0.8 pu and synchronous reactance (X) = 5 pu. The voltages at these reactances are 1.2 V, 1.1 V and 1 V respectively. Find the corresponding sub transient fault current in pu? 2.4 pu 0.2 pu 3.975 pu 1.375 pu 2.4 pu 0.2 pu 3.975 pu 1.375 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power transfer in a transmission line can be obtained by either 1 or 2 reducing reactance None of these increasing voltage level either 1 or 2 reducing reactance None of these increasing voltage level ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge tank is kept very close to the pen stock generator spill way turbine pen stock generator spill way turbine ANSWER DOWNLOAD EXAMIANS APP