Power Systems Which of the following is/are advantages of N-R method? Time taken for each iteration is less Number of iterations are less Applicable for large power system network both 1 and 2 Time taken for each iteration is less Number of iterations are less Applicable for large power system network both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Load frequency control is achieved by properly matching the individual machines generated voltages. generator ratings. reactive powers. turbine inputs. generated voltages. generator ratings. reactive powers. turbine inputs. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Location of a surge tank, in an hydro electric power station is near tail race. dam. turbine. reservoir. tail race. dam. turbine. reservoir. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following buses is/are not PV buses? both 1 and 2 fixed shunt capacitor buses reactive power support buses voltage control buses both 1 and 2 fixed shunt capacitor buses reactive power support buses voltage control buses ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements is true? Corona loss increases with increase in conductor size and increase in supply frequency decrease in conductor size and increase in supply frequency decrease in conductor size and decrease in supply frequency increase in conductor size and decrease in supply frequency increase in conductor size and increase in supply frequency decrease in conductor size and increase in supply frequency decrease in conductor size and decrease in supply frequency increase in conductor size and decrease in supply frequency ANSWER DOWNLOAD EXAMIANS APP
Power Systems A three phase, 33 kV oil circuit breaker is rated 1200 A, the symmetrical breaking capacity is 2000 MVA, 3 secs. Then the making capacity is 5500 MVA. 5000 MVA. 5100 MVA. 5200 MVA. 5500 MVA. 5000 MVA. 5100 MVA. 5200 MVA. ANSWER DOWNLOAD EXAMIANS APP