Power Systems Which of the following is/are advantages of N-R method? Time taken for each iteration is less Number of iterations are less both 1 and 2 Applicable for large power system network Time taken for each iteration is less Number of iterations are less both 1 and 2 Applicable for large power system network ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠°90 Ω, C = 0.5*10^-6∠90° ℧. Find Charging current under no load? 0.512∠90° A/phase 0.344∠90° A/phase 1.144∠90° A/phase 0.144∠90° A/phase 0.512∠90° A/phase 0.344∠90° A/phase 1.144∠90° A/phase 0.144∠90° A/phase ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical mass of the fuel is the amount required to make the multiplication factor less than 1. more than 1. 0.5. equal to factor. less than 1. more than 1. 0.5. equal to factor. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydro power stations what is an enlarged body of water just above the intake and used as a regulating reservoir called Penstock. Spillways. Reservoir. Fore bay. Penstock. Spillways. Reservoir. Fore bay. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A load centre is at an equidistant from the two thermal generating stations G1 and G2. The fuel cost characteristics of the generating stations are given by F1 = a + bP1 + cP²1 F2 = a + b P2 + 2cP²2 Where P1 and P2 are the generation in MW of G1 and G2, respectively. For most economic generation to meet 300 MW of load, P1 and P2 respectively, are 100, 200 150, 150 175, 125 200, 100 100, 200 150, 150 175, 125 200, 100 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Example of base load stations are hydro. both A and B. gas turbine. thermal. hydro. both A and B. gas turbine. thermal. ANSWER DOWNLOAD EXAMIANS APP