For large plants of capacity for more than 15 MW, what type of cooling is used

  Hydrogen.
  Water.
  Air.
  Liquid.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In thermal plant most of the energy is wasted in

 ESP
 boiler
 turbines
 condenser

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Surge impedance loading of a transmission line can be increased by

 addition of lumped capacitance in series
 addition of lumped inductance in parallel
 increasing its voltage level
 both 1 and 3

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 3-phase breaker is rated at 2000 MVA, 33 kV, its making current will be

 70 kVA.
 49 kVA.
  89.22 kVA.
  35 kVA.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be

  0.83.
 0.44.
 1.3.
 0.25.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following is a reaction turbines

  Francis turbine and Kaplan turbine.
  Pelton turbine and Francis turbine.
  None of these.
  Kaplan and Pelton turbine.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑