Power Systems For large plants of capacity for more than 15 MW, what type of cooling is used Water. Liquid. Air. Hydrogen. Water. Liquid. Air. Hydrogen. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the rated receiving end voltage is 33 kV, then what are the limits for safe operation of equipments? 31.35 to 34.65 kV 25 to 35 kV any voltage above 33 kV 33 to 50 kV 31.35 to 34.65 kV 25 to 35 kV any voltage above 33 kV 33 to 50 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of draft tube is reaction turbine is to convert kinetic energy of water. reduce water hammer. increase flow rate of water. all of above. convert kinetic energy of water. reduce water hammer. increase flow rate of water. all of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Reflector of a nuclear reactor are made up of boron. beryllium. cast iron. steel. boron. beryllium. cast iron. steel. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the function of economiser in steam boilers cooling collect ash particals All of these improving thermal efficiency cooling collect ash particals All of these improving thermal efficiency ANSWER DOWNLOAD EXAMIANS APP
Power Systems Frequencies must be same in which of the following line to exchange the power from one place to other place ? No need of same frequency for exchange of power Asynchronous line Synchronous line both 1 and 2 No need of same frequency for exchange of power Asynchronous line Synchronous line both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP