• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
For large plants of capacity for more than 15 MW, what type of cooling is used

  Water.
  Liquid.
  Hydrogen.
  Air.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Specified quantities of slack bus are

 V and δ
 P and δ
 P and Q
 P and V

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If the diameter of the conductor is increased

 the inductance is decreased
 the resistance is increased
 the inductance is increased
 no change in inductance and resistance

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following will take least time in starting from cold condition to full load operation

 Nuclear power plant.
 Thermal power plant.
 Gas turbine plant.
  Hydro electric power plant.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
When a nuclear reaction is operating at constant power the multiplication factor is

  1.
 greater than 1.
 may be any of the above.
 less than 1.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The insulation of the modern EHV lines is designed based on

 corona.
 R × I.
 the lighting voltage.
  the switch voltage.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑