For large plants of capacity for more than 15 MW, what type of cooling is used

  Water.
  Hydrogen.
  Liquid.
  Air.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
For distortion less line which of following relation are true

 R/L = C/G.
 R = O, G = O.
 R/L = G/C.
 None of above.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In an induction relay for a particular current setting the operating time 4 sec. When the time multiplier setting is 0.8 if the time multiplier setting is rest to 1 the operating time is

  un changed.
  1.
 5.
 10.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Pumped storage plant is a

 both 1 and 2
 base load plant
 peak load plant
None of these

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The time taken by the turbine to fall to 0 rpm speed from 3000 rpm is called

  stopping time.
  damping time.
  coasting time.
  settling time.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Due to proximity effect, the increase in conductor resistance is not negligible in

 communication lines
All of these
 overhead transmission lines
 underground cable

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑