Power Systems Switchgear equipment include relays and CB. switches. all of these. fuses. relays and CB. switches. all of these. fuses. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The generating station suitable to operate as peak load plant is Pumped storage. Thermal power station. Nuclear power station. Power station. Pumped storage. Thermal power station. Nuclear power station. Power station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Installation of capacitors at suitable locations and of optimum size in a distribution system results in reduction of KVA rating of distribution transformers improved voltage regulation reduction in distribution power loss All of these reduction of KVA rating of distribution transformers improved voltage regulation reduction in distribution power loss All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a 3-phase, 400 kV transmission line is 400 Ω. The surge impedance loading is 1600 MW 400 MW 200 MW 800 MW 1600 MW 400 MW 200 MW 800 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Reheat cycle in thermal power plant is used to increase thermal efficiency. improve condenser performance. reduce loss of heat. utilize heat of flue gases. increase thermal efficiency. improve condenser performance. reduce loss of heat. utilize heat of flue gases. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum efficiency of modern coal fired steam raising thermal power plants is restricted to about 035 (a low value), mainly because of high energy loss in boiler. high energy loss from turbine exhaust to condenser. low alternative efficiency. low steam turbine mechanical efficiency. high energy loss in boiler. high energy loss from turbine exhaust to condenser. low alternative efficiency. low steam turbine mechanical efficiency. ANSWER DOWNLOAD EXAMIANS APP