Power Systems Gross head of an hydroelectric power station is the height of water level in the river where the storage is provided. the height of water level in the river where the tail race is provided. all of above. the difference of water level between the level in storage and tail race. the height of water level in the river where the storage is provided. the height of water level in the river where the tail race is provided. all of above. the difference of water level between the level in storage and tail race. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If all the sequence voltages at the fault point in a power system are equal, then the fault point is a LL LLG LG LLL LL LLG LG LLL ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum efficiency of modern coal fired steam raising thermal power plants is restricted to about 035 (a low value), mainly because of high energy loss in boiler. low steam turbine mechanical efficiency. low alternative efficiency. high energy loss from turbine exhaust to condenser. high energy loss in boiler. low steam turbine mechanical efficiency. low alternative efficiency. high energy loss from turbine exhaust to condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Hydro-graph is similar to both B and C. mass curve. load curve. energy load curve. both B and C. mass curve. load curve. energy load curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 740 MW. 710 MW. 720 MW. 730 MW. 740 MW. 710 MW. 720 MW. 730 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Peak load power plants is/are pumped storage plant nuclear plants diesel plant both 1 and 2 pumped storage plant nuclear plants diesel plant both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP