Power Systems Gross head of an hydroelectric power station is the height of water level in the river where the tail race is provided. all of above. the height of water level in the river where the storage is provided. the difference of water level between the level in storage and tail race. the height of water level in the river where the tail race is provided. all of above. the height of water level in the river where the storage is provided. the difference of water level between the level in storage and tail race. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Inductance of transmission line will decrease when both GMD and GMR decrease both GMD and GMR increase GMD decrease and GMR increase GMD increase and GMR decrease both GMD and GMR decrease both GMD and GMR increase GMD decrease and GMR increase GMD increase and GMR decrease ANSWER DOWNLOAD EXAMIANS APP
Power Systems A sort line with R/X ratio 1, the zero regulation is obtained when the power factor of the load is 0 leading 0.707 leading unity 0.5 0 leading 0.707 leading unity 0.5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydro power stations what is an enlarged body of water just above the intake and used as a regulating reservoir called Reservoir. Fore bay. Spillways. Penstock. Reservoir. Fore bay. Spillways. Penstock. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the sag(S) of a transmission line? S = wl²/16T S = wl²/8T S = wl²/4T S = wl²/2T S = wl²/16T S = wl²/8T S = wl²/4T S = wl²/2T ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 7.936 pu 9.936 pu 8.936 pu 10.936 pu 7.936 pu 9.936 pu 8.936 pu 10.936 pu ANSWER DOWNLOAD EXAMIANS APP