Power Systems Gross head of an hydroelectric power station is the height of water level in the river where the tail race is provided. the difference of water level between the level in storage and tail race. all of above. the height of water level in the river where the storage is provided. the height of water level in the river where the tail race is provided. the difference of water level between the level in storage and tail race. all of above. the height of water level in the river where the storage is provided. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where do compounding done in thermal power plants Generator. Coal handling plant. Turbine. Ash handling plant. Generator. Coal handling plant. Turbine. Ash handling plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a three-phase system, when the loads are perfectly balanced, the neutral current is zero. one - third of maximum. two - thirds of maximum. one - third of minimum. zero. one - third of maximum. two - thirds of maximum. one - third of minimum. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a power system with negligible resistance, the fault current at a point is 8.00 pu. The series reactance is to be included at the fault point to limit the short circuit. current to 5.00 pu is 0.125 pu. 0.075 pu. 0.200 pu. 3.000 pu. 0.125 pu. 0.075 pu. 0.200 pu. 3.000 pu. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage and current instantaneous values are given as 5 sin (ωt + 30°) pu and 2 sin (ωt - 15°) pu respectively. Find the per unit active power? 5 pu 3.535 pu 7 pu 5.353 pu 5 pu 3.535 pu 7 pu 5.353 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Location of a surge tank, in an hydro electric power station is near tail race. reservoir. dam. turbine. tail race. reservoir. dam. turbine. ANSWER DOWNLOAD EXAMIANS APP