Power Systems Alternate formation and breakage of bubbles are called cavitations. All of these water hamming. surgfication. cavitations. All of these water hamming. surgfication. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Reflection coefficient of voltage is Rv (Zs - Zl)/(Zs + Zl) (Zl - Zs)/(Zs + Zl) 2Zl/(Zs + Zl) 2Zs/(Zs + Zl) (Zs - Zl)/(Zs + Zl) (Zl - Zs)/(Zs + Zl) 2Zl/(Zs + Zl) 2Zs/(Zs + Zl) ANSWER DOWNLOAD EXAMIANS APP
Power Systems Binary vapor cycle are used for increasing the turbine efficiency. All of these improving the plant efficiency. improving the condenser performance. increasing the turbine efficiency. All of these improving the plant efficiency. improving the condenser performance. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 7.936 pu 10.936 pu 8.936 pu 9.936 pu 7.936 pu 10.936 pu 8.936 pu 9.936 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Power system network has a total power of 5000 MW at 50 Hz supplying to the different consumers. Frequency is varying at 1.5% per change of 2% load. Assume R =0.004 Hz/MW. Find the steady state frequency deviation if a sudden loss of 200 MW occur due to tripping of one of the transmission line? -0.52 Hz 50 Hz 0.48 Hz 0.52 Hz -0.52 Hz 50 Hz 0.48 Hz 0.52 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems Bundled conductors in EHV transmission lines increase inductance increase capacitance decrease capacitance decrease inducatance increase inductance increase capacitance decrease capacitance decrease inducatance ANSWER DOWNLOAD EXAMIANS APP