Power Systems Alternate formation and breakage of bubbles are called All of these surgfication. cavitations. water hamming. All of these surgfication. cavitations. water hamming. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MW capacity generator has a speed regulation of 4% for a frequency drop of 0.05 Hz. Find the power input supplied by the turbine for maintaining constant frequency? 10 MW 20 MW 5 MW 15 MW 10 MW 20 MW 5 MW 15 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical disruptive voltage is a voltage at which nether 1 nor 2 corona is just initiated corona is visible with blue or violet colour both 1 and 2 nether 1 nor 2 corona is just initiated corona is visible with blue or violet colour both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station which has a high investment cost and low operating cost is usually operated as a Minimum load station. None of above. Peak load station. Base load station. Minimum load station. None of above. Peak load station. Base load station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MVA alternator operated at no load at frequency of 50 Hz, it has inertia constant of 5 MWsec/MVA and governing system has a time delay of 0.6 sec. If the load of 50 MW is suddenly applied then find the frequency deviation during this time? 0.85 Hz -0.85 Hz -0.76 Hz 0.76 Hz 0.85 Hz -0.85 Hz -0.76 Hz 0.76 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 6000 kW 3000 kW 3750 kW 7500 kW 6000 kW 3000 kW 3750 kW 7500 kW ANSWER DOWNLOAD EXAMIANS APP