Power Systems Binary vapor cycle are used for increasing the turbine efficiency. All of these improving the plant efficiency. improving the condenser performance. increasing the turbine efficiency. All of these improving the plant efficiency. improving the condenser performance. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠90° Ω, C = 0.5*10-6∠90° â„§. Find the no load receiving end voltage? 600 kV 400 kV 320 kv 500 kV 600 kV 400 kV 320 kv 500 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 20 MVA generator has inertia constant of 0.5 pu. Find new value for 50 MVA base? 0.5 pu 0.4 pu 0.1 pu 0.2 pu 0.5 pu 0.4 pu 0.1 pu 0.2 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage regulation of a line at full load 0.8 power factor is 11. A long transmission line under no load conditions, for a good voltage profile needs shunt capacitor at receiving end shunt resistance at receiving end All of these shunt reactor at receiving end shunt capacitor at receiving end shunt resistance at receiving end All of these shunt reactor at receiving end ANSWER DOWNLOAD EXAMIANS APP
Power Systems A moderator material should have small atomic mass. may be any of the above. None of these large atomic mass. small atomic mass. may be any of the above. None of these large atomic mass. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Pulversing unit. Condenser. Ash handling unit. Cooling tower. Pulversing unit. Condenser. Ash handling unit. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP