Power Systems The maximum efficiency of modern coal fired steam steam raising thermal power plants is restricted to about 0.35( a low value), mainly because of high energy loss in boilers high energy loss in condenser low alternator efficiency low steam turbine mechanical efficiency high energy loss in boilers high energy loss in condenser low alternator efficiency low steam turbine mechanical efficiency ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following transmission line is most practically used in load flow analysis? Nominal ∏ Nominal T nether 1 nor 2 either 1 or 2 Nominal ∏ Nominal T nether 1 nor 2 either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems An ACSR conductor has internal inductance 0.05 mH/Km for µr = 1. If this ACSR is replaced with another having µr = 2, then find the internal inductance? 0 mH/Km 0.1 mH/Km 0.025 mH/Km 0.05 mH/Km 0 mH/Km 0.1 mH/Km 0.025 mH/Km 0.05 mH/Km ANSWER DOWNLOAD EXAMIANS APP
Power Systems Isolator in sub station is open under ------------- condition? any of the above full load short circuit no load any of the above full load short circuit no load ANSWER DOWNLOAD EXAMIANS APP
Power Systems The presence of earth in case of overhead lines decrease capacitance increase capacitance increase inductance decrease inducatance decrease capacitance increase capacitance increase inductance decrease inducatance ANSWER DOWNLOAD EXAMIANS APP
Power Systems Recovery voltage in CB is equal to normal frequency 50 Hz rms voltage. arcing period voltage. transient voltage. none of these. normal frequency 50 Hz rms voltage. arcing period voltage. transient voltage. none of these. ANSWER DOWNLOAD EXAMIANS APP