Power Systems The unit protection scheme provides remote protection. primary protection. simultaneous protection. back up protection. remote protection. primary protection. simultaneous protection. back up protection. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Lightning arresters are used for protection of equipment from external lightning All of these protection of equipment from short circuits protection of equipment from open circuits protection of equipment from external lightning All of these protection of equipment from short circuits protection of equipment from open circuits ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements are true? both 1 and 2 Bus admittance matrix is a sparse matrix nether 1 nor 2 Bus impedance matrix is a full matrix both 1 and 2 Bus admittance matrix is a sparse matrix nether 1 nor 2 Bus impedance matrix is a full matrix ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the number of strands of ACSR conductor for 4 layer transmission line? 37 7 1 29 37 7 1 29 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum efficiency of modern coal fired steam raising thermal power plants is restricted to about 035 (a low value), mainly because of low steam turbine mechanical efficiency. high energy loss in boiler. low alternative efficiency. high energy loss from turbine exhaust to condenser. low steam turbine mechanical efficiency. high energy loss in boiler. low alternative efficiency. high energy loss from turbine exhaust to condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The daily energy produced in thermal power station is 720 MWh at a load factor of 0.6. What is the maximum demand of the station? 50 MW 720 MW 72 MW 30 MW 50 MW 720 MW 72 MW 30 MW ANSWER DOWNLOAD EXAMIANS APP