Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠90° Ω, C = 0.5*10^-6∠90° â„§. Find the shunt reactor required for compensating ferranti effect? 500 Ω 2000 Ω 1500 Ω 3000 Ω 500 Ω 2000 Ω 1500 Ω 3000 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems Load frequency control is achieved by properly matching the individual machines turbine inputs. generated voltages. reactive powers. generator ratings. turbine inputs. generated voltages. reactive powers. generator ratings. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Thermal power plant. Nuclear power plant. Gas turbine plant. Hydro electric power plant. Thermal power plant. Nuclear power plant. Gas turbine plant. Hydro electric power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power transfer capability of transmission line can be increased by All of these Using bundled conductors Using series capacitance Parallel transmission lines All of these Using bundled conductors Using series capacitance Parallel transmission lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an induction relay for a particular current setting the operating time 4 sec. When the time multiplier setting is 0.8 if the time multiplier setting is rest to 1 the operating time is 10. un changed. 1. 5. 10. un changed. 1. 5. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For 132 kV system, the reactance and capacitance up to the location of the CB is 3 Ω and 0.015 μF respectively. The maximum value of RRRV is 10.01 kV / μs. 2.0 kV / μs. 9.01 kV / μs. 12.2 kV / μs. 10.01 kV / μs. 2.0 kV / μs. 9.01 kV / μs. 12.2 kV / μs. ANSWER DOWNLOAD EXAMIANS APP