Power Systems A power generating station has a plant capacity of 200 MW and maximum power demand is 150 MW. If average power generation is 110 MW, then find the load factor and capacity factor respectively? 0.55 and 0.733 0.733 and 0.55 0.733 and 0.65 0.65 and 0.55 0.55 and 0.733 0.733 and 0.55 0.733 and 0.65 0.65 and 0.55 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Efficiency of thermal power plant can be taken as turbine efficiency. efficiency of thermal cycle. generator efficiency. product of efficiencies of all stages. turbine efficiency. efficiency of thermal cycle. generator efficiency. product of efficiencies of all stages. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Nuclear. Thermal. Hydro Power Plant Gas turbine. Nuclear. Thermal. Hydro Power Plant Gas turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydraulic turbine having rated speed of 250 rpm is connected to a synchronous generator. In order to produce power at 50 Hz, the numbers of pole are required in the generator 16. 12. 24. 6. 16. 12. 24. 6. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If transmission line parameters A and B are 0.9∠0° and 200∠90° respectively. Find the shunt reactor required to compensate the ferranti effect? 3000 Ω 2000 Ω 750 Ω 1500 Ω 3000 Ω 2000 Ω 750 Ω 1500 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems Phase shift occurs due to which of the following components? inductance both 1 and 2 conductance capacitance inductance both 1 and 2 conductance capacitance ANSWER DOWNLOAD EXAMIANS APP