Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Pulversing unit. Ash handling unit. Condenser. Cooling tower. Pulversing unit. Ash handling unit. Condenser. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Asynchronous tie line is a either 1 or 2 DC transmission line AC transmission line None of these either 1 or 2 DC transmission line AC transmission line None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The 1st nuclear plant in world was commissioned in UAE. U.S.A. U.K. U.S.S.R. UAE. U.S.A. U.K. U.S.S.R. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 3.5 × 106 kV / sec. 1 × 106 kV / sec. 2 × 106 kV / sec. 3 × 106 kV / sec. 3.5 × 106 kV / sec. 1 × 106 kV / sec. 2 × 106 kV / sec. 3 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The amount of ash content in Indian coal 60 %. 20 %. 45 %. 35 %. 60 %. 20 %. 45 %. 35 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15 MW. The plant capacity is 20 MW. Find the reserve capacity of the plant? 20 MW 10 MW 15 MW 5 MW 20 MW 10 MW 15 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP