Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Ash handling unit. Condenser. Cooling tower. Pulversing unit. Ash handling unit. Condenser. Cooling tower. Pulversing unit. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When a pumped storage power plant is operated in conjunction with a steam power plant load factor of the steam plant is increased chances of the tripping of the system decrease All of these the operating cost of the steam plant become optimum load factor of the steam plant is increased chances of the tripping of the system decrease All of these the operating cost of the steam plant become optimum ANSWER DOWNLOAD EXAMIANS APP
Power Systems The equation of area control error(ACE) is ACE = ΔPtie - b.Δf ACE = ΔPtie + b.Δf ACE = ΔPtie - 1/b.Δf ACE = ΔPtie +1/ b.Δf ACE = ΔPtie - b.Δf ACE = ΔPtie + b.Δf ACE = ΔPtie - 1/b.Δf ACE = ΔPtie +1/ b.Δf ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has (2 + j4)Ω impedance, 100 MVA and base voltage is 10 KV. Find the per unit impedance value of transmission line? (2 + j4 ) pu (4 + j8 ) pu (0.5 + j1 ) pu (1 + j2 ) pu (2 + j4 ) pu (4 + j8 ) pu (0.5 + j1 ) pu (1 + j2 ) pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following quantities are to be calculated for generator bus? Q and δ δ and V P and Q P and V Q and δ δ and V P and Q P and V ANSWER DOWNLOAD EXAMIANS APP
Power Systems In which of the following given faults, all the sequence currents are equal? LLG LG LLL LL LLG LG LLL LL ANSWER DOWNLOAD EXAMIANS APP