Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Condenser. Pulversing unit. Ash handling unit. Cooling tower. Condenser. Pulversing unit. Ash handling unit. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro electric generating station is supplied from a reservoir of capacity 5 × 10 − 6 cubic meters at a head of 200 meters. Find the total energy available in KWh if the overall efficiency is 75 % 4.06 × 106 kWh. 2.044 × 106 kWh. 5 × 106 kWh. 3 × 106 kWh. 4.06 × 106 kWh. 2.044 × 106 kWh. 5 × 106 kWh. 3 × 106 kWh. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is best suited for capacitor bank switching? Air blast CB. SF6 CB. Oil CB. Vacuum CB. Air blast CB. SF6 CB. Oil CB. Vacuum CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems India 1st nuclear plant was set up at Rana pratap sagar. Tarapur. Bhaba. Kalpakkam. Rana pratap sagar. Tarapur. Bhaba. Kalpakkam. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Example of base load stations are hydro. both A and B. gas turbine. thermal. hydro. both A and B. gas turbine. thermal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Deflectors are provided in propeller turbine. Francis turbine. Pelton wheel. Kaplan turbine. propeller turbine. Francis turbine. Pelton wheel. Kaplan turbine. ANSWER DOWNLOAD EXAMIANS APP