Power Systems A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging. 56 %. 14 %. 28 %. None of above 56 %. 14 %. 28 %. None of above ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault current is 2000 A, the relay setting is 50% and CT ratio is 400 : 5, then plug setting multiplier will be 10. 50. 15. 25. 10. 50. 15. 25. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Main bus bar protection scheme is /are fault bus protection. both fault bus and differential protection. differential protection. none of these. fault bus protection. both fault bus and differential protection. differential protection. none of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gas turbine power plants for maximum efficient may have All of above. Multistage compression. Reheating. Heat exchangers. All of above. Multistage compression. Reheating. Heat exchangers. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load current in short circuit calculations are neglected because nether 1 nor 2 short circuit currents are greatly out of phase with load currents both 1 and 2 short circuit currents are much larger than load currents nether 1 nor 2 short circuit currents are greatly out of phase with load currents both 1 and 2 short circuit currents are much larger than load currents ANSWER DOWNLOAD EXAMIANS APP
Power Systems Characteristics of arc quenching medium is/are High thermal conductivity Non flammable High dielectric strength All of these High thermal conductivity Non flammable High dielectric strength All of these ANSWER DOWNLOAD EXAMIANS APP