Power Systems A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging. 56 %. None of above 28 %. 14 %. 56 %. None of above 28 %. 14 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two insulator discs of identical capacitance value C make up a string for a 22 kV, 50 Hz, single phase overhead line insulation system. If pin to earth capacitance is also C, then find the string efficiency? 90% 75% 50% 86%% 90% 75% 50% 86%% ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 6 MW 10 MW 12 MW 5 MW 6 MW 10 MW 12 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A string insulator has 4 units. The voltage across the bottom most unit is 33.33% of total voltage. Its string efficiency is 75% 33.33% 25% 66.66% 75% 33.33% 25% 66.66% ANSWER DOWNLOAD EXAMIANS APP
Power Systems The amount of ash content in Indian coal 45 %. 60 %. 35 %. 20 %. 45 %. 60 %. 35 %. 20 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has surge impedance of 400 Ω, operating at Vs = Vr = 400 kV line is compensated with a shunt capacitance of 30%. The line is connected to a generator delivering 200 MW. Find the load angle with out and with compensation respectively? 30° and 26° 26° and 30° 30° and 45° 45° and 26° 30° and 26° 26° and 30° 30° and 45° 45° and 26° ANSWER DOWNLOAD EXAMIANS APP