Power Systems A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging. 56 %. 28 %. None of above 14 %. 56 %. 28 %. None of above 14 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems On which one of the following cycles does a modern steam power plant work? Otto cycle Carnot cycle Bell-Coleman cycle Rankine cycle Otto cycle Carnot cycle Bell-Coleman cycle Rankine cycle ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ABCD constants of a 3-phase transmission line are A = D = 0.8∠1°, B = 170∠85° Ω , C = 0.002∠90.4° â„§. The sending end voltage is 400 kV. The receiving end voltage under no load condition is 500 kV 400 kV 350 kV 600 kV 500 kV 400 kV 350 kV 600 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the rated receiving end voltage is 33 kV, then what are the limits for safe operation of equipments? 31.35 to 34.65 kV any voltage above 33 kV 33 to 50 kV 25 to 35 kV 31.35 to 34.65 kV any voltage above 33 kV 33 to 50 kV 25 to 35 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage and current instantaneous values are given as 5 sin (ωt + 30°) pu and 2 sin (ωt - 15°) pu respectively. Find the per unit active power? 5 pu 3.535 pu 7 pu 5.353 pu 5 pu 3.535 pu 7 pu 5.353 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The internal flux linkage due to internal flux of a conductor is I/4*10-7 wb-T/m I/2*10-7 wb-T/m All of these I/6*10-7 wb-T/m I/4*10-7 wb-T/m I/2*10-7 wb-T/m All of these I/6*10-7 wb-T/m ANSWER DOWNLOAD EXAMIANS APP