Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 6000 kW 7500 kW 3750 kW 3000 kW 6000 kW 7500 kW 3750 kW 3000 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Incremental cost of two generators Ic1 = 0.2 P1+60, Ic2 = 0.3 P2+40 and the ratings of the generator are 150 and 250 MW. Find the load sharing of each generator for a load of 200 MW? P1 = 80 MW, P2 = 120 MW P1 = 100 MW, P2 = 100 MW P1 = 60 MW, P2 = 140 MW P1 = 120 MW, P2 = 80 MW P1 = 80 MW, P2 = 120 MW P1 = 100 MW, P2 = 100 MW P1 = 60 MW, P2 = 140 MW P1 = 120 MW, P2 = 80 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Hydro electric power plant. Gas turbine plant. Thermal power plant. Nuclear power plant. Hydro electric power plant. Gas turbine plant. Thermal power plant. Nuclear power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Reheat cycle in thermal power plant is used to reduce loss of heat. increase thermal efficiency. improve condenser performance. utilize heat of flue gases. reduce loss of heat. increase thermal efficiency. improve condenser performance. utilize heat of flue gases. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Most commonly used material for insulator is All of these glass porcelain mica All of these glass porcelain mica ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following rotor is used in thermal power plants? squirrel cage rotor either of these salient pole rotor cylindrical rotor squirrel cage rotor either of these salient pole rotor cylindrical rotor ANSWER DOWNLOAD EXAMIANS APP