Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 3750 kW 6000 kW 3000 kW 7500 kW 3750 kW 6000 kW 3000 kW 7500 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The steam power plant efficiency can be improved by using high temperature and high pressure steam. burning large amount of coal. decreasing the load on the plant. using large quantity of water. using high temperature and high pressure steam. burning large amount of coal. decreasing the load on the plant. using large quantity of water. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15 MW. The plant capacity is 20 MW. Find the reserve capacity of the plant? 15 MW 5 MW 10 MW 20 MW 15 MW 5 MW 10 MW 20 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Nuclear reactors usually employ fusion. none of above. fission. both of A and B. fusion. none of above. fission. both of A and B. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Four identical alternators each are rated for 20 MVA, 11 KV having a subtransient reactance of 16% are working in parallel. The short circuit level at the busbar is 100 MVA 125 MVA 500 MVA 400 MVA 100 MVA 125 MVA 500 MVA 400 MVA ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are the disadvantages of phase modifiers? It consumes both active and reactive power All of these Initial cost of synchronous phase modifier is higher It requires more maintenance because of running equipment It consumes both active and reactive power All of these Initial cost of synchronous phase modifier is higher It requires more maintenance because of running equipment ANSWER DOWNLOAD EXAMIANS APP