Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 3750 kW 3000 kW 6000 kW 7500 kW 3750 kW 3000 kW 6000 kW 7500 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of draft tube is reaction turbine is to convert kinetic energy of water. reduce water hammer. increase flow rate of water. all of above. convert kinetic energy of water. reduce water hammer. increase flow rate of water. all of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems At slack bus, which one of the following combinations of variables is not specified? V and δ P and V P and Q Q and V V and δ P and V P and Q Q and V ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the inertia constant H = 8 MJ/MVA for a 50 MVA generator, the stored energy is 50 MJ 8 MJ 400 MJ 200 MJ 50 MJ 8 MJ 400 MJ 200 MJ ANSWER DOWNLOAD EXAMIANS APP
Power Systems Resistance switching in normally employed in all breakers. bulk oil breakers. minimum oil breakers. air blast circuit breaker. all breakers. bulk oil breakers. minimum oil breakers. air blast circuit breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When series reactor is used in generating stations, the fault current magnitude is any of the above reduced remains unaffected increased any of the above reduced remains unaffected increased ANSWER DOWNLOAD EXAMIANS APP