Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 7500 kW 3750 kW 3000 kW 6000 kW 7500 kW 3750 kW 3000 kW 6000 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Efficiency of thermal power plant can be taken as product of efficiencies of all stages. turbine efficiency. generator efficiency. efficiency of thermal cycle. product of efficiencies of all stages. turbine efficiency. generator efficiency. efficiency of thermal cycle. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Characteristics of arc quenching medium is/are All of these High thermal conductivity Non flammable High dielectric strength All of these High thermal conductivity Non flammable High dielectric strength ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge tank is kept very close to the pen stock turbine generator spill way pen stock turbine generator spill way ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 3. 5. 7. 20. 3. 5. 7. 20. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pelton turbine is a ----------- turbine inward radial flow any of the above impulsive axial flow inward radial flow any of the above impulsive axial flow ANSWER DOWNLOAD EXAMIANS APP