Power Systems A hydro electric generating station is supplied from a reservoir of capacity 5 × 10 − 6 cubic meters at a head of 200 meters. Find the total energy available in KWh if the overall efficiency is 75 % 4.06 × 106 kWh. 2.044 × 106 kWh. 3 × 106 kWh. 5 × 106 kWh. 4.06 × 106 kWh. 2.044 × 106 kWh. 3 × 106 kWh. 5 × 106 kWh. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A coal fired steam power station working at a plant factor of 80% has one 500 MW generating unit. If the heat content of coal is 2 kWh/kg, the overall plant efficiency is 40% and a train load of coal is 2000 metric tons, then the number of trains required daily for the plant is 6 16 10 2 6 16 10 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Fault calculations using computer are usually done by Z bus method Y bus method either 1 or 2 None of these Z bus method Y bus method either 1 or 2 None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements are true? Bus impedance matrix is a full matrix nether 1 nor 2 Bus admittance matrix is a sparse matrix both 1 and 2 Bus impedance matrix is a full matrix nether 1 nor 2 Bus admittance matrix is a sparse matrix both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase, 110 kV coaxial XLPE insulated power cable delivering power at 50 Hz, has a capacitance of 125 nF/km. If the dielectric loss tangent of XLPE is 2*10^-4, then dielcetric power loss in this cable in W/km/phase is 35.45 23.9 31.7 38.6 35.45 23.9 31.7 38.6 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A Pelton wheel turbine having a rated speed of 300 rpm is connected to an alternator to produce power at 50 Hz. The number of poles required in the alternator is 10 8 4 20 10 8 4 20 ANSWER DOWNLOAD EXAMIANS APP