Power Systems A hydro electric generating station is supplied from a reservoir of capacity 5 × 10 − 6 cubic meters at a head of 200 meters. Find the total energy available in KWh if the overall efficiency is 75 % 4.06 × 106 kWh. 2.044 × 106 kWh. 5 × 106 kWh. 3 × 106 kWh. 4.06 × 106 kWh. 2.044 × 106 kWh. 5 × 106 kWh. 3 × 106 kWh. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gross head of an hydroelectric power station is the height of water level in the river where the storage is provided. the difference of water level between the level in storage and tail race. all of above. the height of water level in the river where the tail race is provided. the height of water level in the river where the storage is provided. the difference of water level between the level in storage and tail race. all of above. the height of water level in the river where the tail race is provided. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the relation between sub transient (X"), transient (X') and synchronous reactance (X) ? X" > X' >X X" < X' < X X" > X' < X X" < X' > X X" > X' >X X" < X' < X X" > X' < X X" < X' > X ANSWER DOWNLOAD EXAMIANS APP
Power Systems The maximum demand of a consumer is 2 kW and corresponding daily energy consumption is 30 units. What is the corresponding load factor? 75% 62.5% 25% 50.5% 75% 62.5% 25% 50.5% ANSWER DOWNLOAD EXAMIANS APP
Power Systems Deaerative heating is done to heat the steam. heat the feed water. remove dissolved. remove dissolved gases in water. heat the steam. heat the feed water. remove dissolved. remove dissolved gases in water. ANSWER DOWNLOAD EXAMIANS APP
Power Systems One million cubic meters of water is stored in a reservoir feeding a water turbine. The density of water is 993 kg/m³. If the centre of mass of water is 50 meters above the turbine and losses are negligible, the energy produced by that volume of water is 140 MWhr 120 MWhr 135.3 MWhr 130.2 MWhr 140 MWhr 120 MWhr 135.3 MWhr 130.2 MWhr ANSWER DOWNLOAD EXAMIANS APP