Power Systems Peak load power plants is/are diesel plant pumped storage plant both 1 and 2 nuclear plants diesel plant pumped storage plant both 1 and 2 nuclear plants ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 0 MW and PG2 = 250 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 250 MW and PG2 = 0 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the inertia constant H = 10 MJ/MVA for a 50 MVA generator, the stored energy is 500 MJ 50 MJ 5 MJ 10 MJ 500 MJ 50 MJ 5 MJ 10 MJ ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line is compensated with shunt capacitance Csh. After shunt compensation surge impedance loading will increases None of these decreases remains unaffected increases None of these decreases remains unaffected ANSWER DOWNLOAD EXAMIANS APP
Power Systems Water hamming process in pen-stocks results in noise increases, pressure increases, velocity decreases. pressure increases. None of these noise increases. noise increases, pressure increases, velocity decreases. pressure increases. None of these noise increases. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following material is not used as fuse element? Silver. Aluminium. Copper. Carbon. Silver. Aluminium. Copper. Carbon. ANSWER DOWNLOAD EXAMIANS APP