Power Systems

Power Systems
Peak load power plants is/are

 diesel plant
 pumped storage plant
 both 1 and 2
 nuclear plants

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A network containing 50 buses in which 10 are the voltage control buses, 6 are the generator buses. Find the size of the Jacobian matrix?

 33*33
 83*83
 34*34
 84*84

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The draw back of NR method as compare to Gauss-Seidel method is/are?

None of these
 both 1 and 2
 large requirement of computer memory
 large number of iterations

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In Francis turbine runner, the number blades is usually of the order of

 3 - 6.
  16 - 24.
 12 - 14.
 6 - 8.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following power plants needs highly skilled/qualified engineers for its operation

 Nuclear.
 Gas-turbine.
 Thermal.
 Hydro Power Plant

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Earth fault relay uses the which of the following sequence currents?

 negative sequence
 any of the above
 positive sequence
 zero sequence

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑