Power Systems Peak load power plants is/are nuclear plants pumped storage plant both 1 and 2 diesel plant nuclear plants pumped storage plant both 1 and 2 diesel plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems What should be the minimum depth (in metre)of cable trench to dug for laying of 1.1 kV? 0.90. 1.20. 0.75. 1.05. 0.90. 1.20. 0.75. 1.05. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In case of failure of prime mover of the generator, which type of relay is used? distance relays reverse power relay impedance relay offset mho relay distance relays reverse power relay impedance relay offset mho relay ANSWER DOWNLOAD EXAMIANS APP
Power Systems For head and low discharge the water turbine used propeller turbine. Pelton wheel. Francis turbine. Kaplan wheel. propeller turbine. Pelton wheel. Francis turbine. Kaplan wheel. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following matrix is used for load flow studies? Y bus matrix Unit matrix Z bus matrix null matrix Y bus matrix Unit matrix Z bus matrix null matrix ANSWER DOWNLOAD EXAMIANS APP
Power Systems If sparsity of a 5 bus transmission line is 0.4. Find the number of transmission lines? 6 4 5 3 6 4 5 3 ANSWER DOWNLOAD EXAMIANS APP