Power Systems Peak load power plants is/are nuclear plants diesel plant both 1 and 2 pumped storage plant nuclear plants diesel plant both 1 and 2 pumped storage plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Y bus matrix of a 100 bus interconnected system is 90% sparse. Then find the number of non zero elements in the Y bus matrix? 9000 90 1000 10 9000 90 1000 10 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In case of failure of prime mover of the generator, which type of relay is used? distance relays offset mho relay reverse power relay impedance relay distance relays offset mho relay reverse power relay impedance relay ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which cooling is preferred for large turbine generator Nitrogen cooling. Oxygen cooling. None of these. Hydrogen cooling. Nitrogen cooling. Oxygen cooling. None of these. Hydrogen cooling. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What will be the ratio of the C.T. on the H.V side of a 3 - φ star / delta 33 / 11 kV transformer if the protecting CT on the LV side has a ratio of 300 : 5 ? 150 : 4 / √3. 120 : 6 / √3. 100 : 5 / √3. 200 : 5 / √3. 150 : 4 / √3. 120 : 6 / √3. 100 : 5 / √3. 200 : 5 / √3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum efficiency of modern coal fired steam raising thermal power plants is restricted to about 035 (a low value), mainly because of high energy loss from turbine exhaust to condenser. low steam turbine mechanical efficiency. low alternative efficiency. high energy loss in boiler. high energy loss from turbine exhaust to condenser. low steam turbine mechanical efficiency. low alternative efficiency. high energy loss in boiler. ANSWER DOWNLOAD EXAMIANS APP