Power Systems

Power Systems
Peak load power plants is/are

 nuclear plants
 pumped storage plant
 diesel plant
 both 1 and 2

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following material is not used as fuse element?

  Copper.
  Aluminium.
  Carbon.
  Silver.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A load centre is at an equidistant from the two thermal generating stations G1 and G2. The fuel cost characteristics of the generating stations are given by F1 = a + bP1 + cP²1 F2 = a + b P2 + 2cP²2 Where P1 and P2 are the generation in MW of G1 and G2, respectively. For most economic generation to meet 300 MW of load, P1 and P2 respectively, are

 100, 200
 150, 150
 200, 100
 175, 125

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs.

 7.
 20.
  5.
 3.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a 400 KV network, 360 KV is recorded at a 400 KV bus. The reactive power absorbed by shunt rated for 50 MVAr, 400 KV connected at the bus is

 55.56 MVAr.
  40.5 MVAr.
 45 MVAr.
 61.73 MVAr.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The equation of area control error(ACE) is

 ACE = ΔPtie +1/ b.Δf
 ACE = ΔPtie - 1/b.Δf
 ACE = ΔPtie + b.Δf
 ACE = ΔPtie - b.Δf

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑