Power Systems Peak load power plants is/are diesel plant nuclear plants pumped storage plant both 1 and 2 diesel plant nuclear plants pumped storage plant both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following method is used for changing power factor from leading to lagging shunt capacitor any of the above series capacitor shunt reactor shunt capacitor any of the above series capacitor shunt reactor ANSWER DOWNLOAD EXAMIANS APP
Power Systems An ACSR conductor has a diameter of 2 cm has internal inductance of 0.05 mH/Km. If this ACSR is replaced with another having a diameter of 4 cm then its internal inductance is 0.05 mH/Km 0.1 mH/Km 0.025 mH/Km 0 mH/Km 0.05 mH/Km 0.1 mH/Km 0.025 mH/Km 0 mH/Km ANSWER DOWNLOAD EXAMIANS APP
Power Systems The insulator thickness on the conductor, in cables depends upon voltage reactive power power factor current voltage reactive power power factor current ANSWER DOWNLOAD EXAMIANS APP
Power Systems Units of incremental cost is Rs/MWhr RsMW/hr MWhr/Rs Rs/hr Rs/MWhr RsMW/hr MWhr/Rs Rs/hr ANSWER DOWNLOAD EXAMIANS APP
Power Systems Earthing switch is used for All of these measuring of safety voltage discharging residual energies protection of equipment from ground faults All of these measuring of safety voltage discharging residual energies protection of equipment from ground faults ANSWER DOWNLOAD EXAMIANS APP