Power Systems Peak load power plants is/are pumped storage plant both 1 and 2 nuclear plants diesel plant pumped storage plant both 1 and 2 nuclear plants diesel plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following matrix is used for load flow studies? Y bus matrix Z bus matrix Unit matrix null matrix Y bus matrix Z bus matrix Unit matrix null matrix ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has 200 km operating at frequency of 10 Hz Hz. Find the type of the line long transmission line any of the above short transmission line medium transmission line long transmission line any of the above short transmission line medium transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems The advantage of hydro electric power station over thermal power station is hydro electric power station can supply the power throughout the year the operation cost of hydro electric power station is low hydro electric station can be constructed at the place where the energy is required the initial cost of hydro electric power station is low hydro electric power station can supply the power throughout the year the operation cost of hydro electric power station is low hydro electric station can be constructed at the place where the energy is required the initial cost of hydro electric power station is low ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which statement is not correct for the transmission line parameter R, L, G and C At high frequencies at which most of communication system operate the internal inductance of the conductor is neglected. G = I/R. R is the AC resistance per unit length of conductor C. For each line, the conductors are characterized by σ c, μ c, εo = ε c and the homog The line parameter R,L,G and C are uniformly distributed along the entire length of the line C. At high frequencies at which most of communication system operate the internal inductance of the conductor is neglected. G = I/R. R is the AC resistance per unit length of conductor C. For each line, the conductors are characterized by σ c, μ c, εo = ε c and the homog The line parameter R,L,G and C are uniformly distributed along the entire length of the line C. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A hydro electric generating station is supplied from a reservoir of capacity 5 × 10 − 6 cubic meters at a head of 200 meters. Find the total energy available in KWh if the overall efficiency is 75 % 3 × 106 kWh. 5 × 106 kWh. 2.044 × 106 kWh. 4.06 × 106 kWh. 3 × 106 kWh. 5 × 106 kWh. 2.044 × 106 kWh. 4.06 × 106 kWh. ANSWER DOWNLOAD EXAMIANS APP