Power Systems Peak load power plants is/are nuclear plants diesel plant both 1 and 2 pumped storage plant nuclear plants diesel plant both 1 and 2 pumped storage plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems In coal fired thermal power stations, what are the electrostatic precipitators used for? All of these To keep the air heaters clean To remove dust particles setting on the bus bar conductors in the station switch yard To collect the dust particles from the flue gases All of these To keep the air heaters clean To remove dust particles setting on the bus bar conductors in the station switch yard To collect the dust particles from the flue gases ANSWER DOWNLOAD EXAMIANS APP
Power Systems Power system network has a total power of 5000 MW at 50 Hz supplying to the different consumers. Frequency is varying at 1.5% per change of 2% load. Assume R =0.004 Hz/MW. Find the steady state frequency deviation if a sudden loss of 200 MW occur due to tripping of one of the transmission line? 0.48 Hz 50 Hz -0.52 Hz 0.52 Hz 0.48 Hz 50 Hz -0.52 Hz 0.52 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems What will be the ratio of the C.T. on the H.V side of a 3 - φ star / delta 33 / 11 kV transformer if the protecting CT on the LV side has a ratio of 300 : 5 ? 150 : 4 / √3. 200 : 5 / √3. 100 : 5 / √3. 120 : 6 / √3. 150 : 4 / √3. 200 : 5 / √3. 100 : 5 / √3. 120 : 6 / √3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The value of diversity factor is 0 greater than 1 1 less than 1 0 greater than 1 1 less than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mho relay is used for the protection of long transmission lines. no length criterion. medium length lines. short length lines. long transmission lines. no length criterion. medium length lines. short length lines. ANSWER DOWNLOAD EXAMIANS APP