Power Systems Maximum efficiency of modern coal fired steam raising thermal power plants is restricted to about 035 (a low value), mainly because of low steam turbine mechanical efficiency. low alternative efficiency. high energy loss in boiler. high energy loss from turbine exhaust to condenser. low steam turbine mechanical efficiency. low alternative efficiency. high energy loss in boiler. high energy loss from turbine exhaust to condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If we increase the spacing between the phase conductors, the value of line inductance None of these remains unaffected decrease increase None of these remains unaffected decrease increase ANSWER DOWNLOAD EXAMIANS APP
Power Systems In transmission lines distribution constants are both 1 and 2 resistance inductance and capacitance inductance and resistance both 1 and 2 resistance inductance and capacitance inductance and resistance ANSWER DOWNLOAD EXAMIANS APP
Power Systems For transmission line which one of the following relation is true? AD - BC = 1 AD - BC = -1 AD - BC = 0 AD + BC = 0 AD - BC = 1 AD - BC = -1 AD - BC = 0 AD + BC = 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Power system network has a total power of 5000 MW at 50 Hz supplying to the different consumers. Frequency is varying at 1.5% per change of 2% load. Assume R =0.004 Hz/MW. Find the steady state frequency deviation if a sudden loss of 200 MW occur due to tripping of one of the transmission line? -0.52 Hz 0.52 Hz 0.48 Hz 50 Hz -0.52 Hz 0.52 Hz 0.48 Hz 50 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems India 1st nuclear plant was set up at Rana pratap sagar. Tarapur. Bhaba. Kalpakkam. Rana pratap sagar. Tarapur. Bhaba. Kalpakkam. ANSWER DOWNLOAD EXAMIANS APP