Power Systems The specific speed ( NS ) of turbine is given by N√( P ) / H1.25. P√( N ) / H3/2. none of these. N√( P ) / H2/3. N√( P ) / H1.25. P√( N ) / H3/2. none of these. N√( P ) / H2/3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The presence of earth in case of overhead lines increase inductance decrease capacitance decrease inducatance increase capacitance increase inductance decrease capacitance decrease inducatance increase capacitance ANSWER DOWNLOAD EXAMIANS APP
Power Systems For flat voltage profile system, voltage regulation is 50% 100% any of the above 0% 50% 100% any of the above 0% ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 250 MW and PG2 = 0 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 0 MW and PG2 = 250 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rating of fuse wire is always expressed in ampere-volts. ampere-hours. kWh. amperes. ampere-volts. ampere-hours. kWh. amperes. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which one of the following relays has the capability of anticipating the possible major fault in a transformer? Buchholz relay Over current relay Over fluxing relay Differential relay Buchholz relay Over current relay Over fluxing relay Differential relay ANSWER DOWNLOAD EXAMIANS APP