Power Systems Four identical alternators each are rated for 20 MVA, 11 KV having a subtransient reactance of 16% are working in parallel. The short circuit level at the busbar is 500 MVA 400 MVA 125 MVA 100 MVA 500 MVA 400 MVA 125 MVA 100 MVA ANSWER DOWNLOAD EXAMIANS APP
Power Systems To improve the efficiency of thermal power plant ________________ is placed between boiler and turbine. ash handling point. air preheater. superheater. economizer. ash handling point. air preheater. superheater. economizer. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which power plant cannot have single unit of 100 MW capacity Diesel engine plant. Nuclear power plant. Steam power plant. Hydro electric power plant. Diesel engine plant. Nuclear power plant. Steam power plant. Hydro electric power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For symmetrical network, the neutral current is maximum zero infinity any of the above maximum zero infinity any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has self and mutual impedances of 0.8 pu and 0.2 pu. Find the positive, negative and zero sequence impedances respectively? 0.6, 0.8 and 1.2 pu 0.8, 0.6 and 1.2 pu 0.6, 0.6 and 1.2 pu 0.8, 0.8 and 1.2 pu 0.6, 0.8 and 1.2 pu 0.8, 0.6 and 1.2 pu 0.6, 0.6 and 1.2 pu 0.8, 0.8 and 1.2 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j9 pu j6 pu j3 pu j1 pu j9 pu j6 pu j3 pu j1 pu ANSWER DOWNLOAD EXAMIANS APP