Power Systems A penstock is used as a condition between none of above. the dam and the turbine in a hydro station. the turbine and discharge drain. the heat ex-changer and the turbine in nuclear power plant. none of above. the dam and the turbine in a hydro station. the turbine and discharge drain. the heat ex-changer and the turbine in nuclear power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MVA alternator operated at no load at frequency of 50 Hz, it has inertia constant of 5 MWsec/MVA and governing system has a time delay of 0.6 sec. If the load of 50 MW is suddenly applied then find the frequency deviation during this time? 0.76 Hz -0.85 Hz 0.85 Hz -0.76 Hz 0.76 Hz -0.85 Hz 0.85 Hz -0.76 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems Asynchronous tie line is a DC transmission line None of these AC transmission line either 1 or 2 DC transmission line None of these AC transmission line either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following plants is/are base load plants run off river nuclear both 1 and 2 pump storage run off river nuclear both 1 and 2 pump storage ANSWER DOWNLOAD EXAMIANS APP
Power Systems For flat voltage profile system, voltage regulation is any of the above 50% 100% 0% any of the above 50% 100% 0% ANSWER DOWNLOAD EXAMIANS APP
Power Systems The insulation of modern EHV is designed based on switching voltage. corona. lightning voltage. RI. switching voltage. corona. lightning voltage. RI. ANSWER DOWNLOAD EXAMIANS APP