Power Systems Breaking current is a ------------------ value? any of the above maximum average RMS any of the above maximum average RMS ANSWER DOWNLOAD EXAMIANS APP
Power Systems In load flow studies PV bus is treated as PQ bus when voltage at the bus become high any of the above reactive power goes beyond limit phase angle become high voltage at the bus become high any of the above reactive power goes beyond limit phase angle become high ANSWER DOWNLOAD EXAMIANS APP
Power Systems To improve the efficiency of thermal power plant ________________ is placed between boiler and turbine. economizer. air preheater. superheater. ash handling point. economizer. air preheater. superheater. ash handling point. ANSWER DOWNLOAD EXAMIANS APP
Power Systems On what factor does the performance of a circuit breaker depend? Breaking speed. Both A and C. None of these. Critical length of breaking. Breaking speed. Both A and C. None of these. Critical length of breaking. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive (Z1), negative (Z2) and zero sequence (Z0) impedances of a transmission line follows the relation (Z1 = Z2) > Z0 Z1 = Z2 = Z0 any of the above (Z1 = Z2) < Z0 (Z1 = Z2) > Z0 Z1 = Z2 = Z0 any of the above (Z1 = Z2) < Z0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of reflector is to stop the chain reaction. bounce back most of the neutrons that escape from the fuel core. none of above. reduce the speed of the neutrons. stop the chain reaction. bounce back most of the neutrons that escape from the fuel core. none of above. reduce the speed of the neutrons. ANSWER DOWNLOAD EXAMIANS APP