Power Systems Breaking current is a ------------------ value? any of the above maximum average RMS any of the above maximum average RMS ANSWER DOWNLOAD EXAMIANS APP
Power Systems India 1st nuclear plant was set up at Rana pratap sagar. Kalpakkam. Bhaba. Tarapur. Rana pratap sagar. Kalpakkam. Bhaba. Tarapur. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the frequency is increased, then skin effect will any of the above remains unaffected decreases increases any of the above remains unaffected decreases increases ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of shunt compensation is/are All of these It requires less maintanance smooth voltage regulation is possible by controlling excitation single unit can be used as both capacitance and inductor by adjusting the excitation All of these It requires less maintanance smooth voltage regulation is possible by controlling excitation single unit can be used as both capacitance and inductor by adjusting the excitation ANSWER DOWNLOAD EXAMIANS APP
Power Systems Earthing switch is used for protection of equipment from ground faults measuring of safety voltage discharging residual energies All of these protection of equipment from ground faults measuring of safety voltage discharging residual energies All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems If, for a given alternator in economic operation mode, the incremental cost is given by (0.012 P + 8) Rs/MWh, dPL/dP = 0.2 and plant λ = 25, then power generation is 1250 MW 1000 MW 1500 MW 750 MW 1250 MW 1000 MW 1500 MW 750 MW ANSWER DOWNLOAD EXAMIANS APP