Power Systems Breaking current is a ------------------ value? average RMS maximum any of the above average RMS maximum any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of pumped storage plants is/are used as load frequency control All of these operating time is minimum most economical as a peak load supply plant used as load frequency control All of these operating time is minimum most economical as a peak load supply plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems In load flow studies PV bus is treated as PQ bus when reactive power goes beyond limit phase angle become high any of the above voltage at the bus become high reactive power goes beyond limit phase angle become high any of the above voltage at the bus become high ANSWER DOWNLOAD EXAMIANS APP
Power Systems For a fixed value of complex power flow in a transmission line having a sending end voltage V, the real power loss will be proportional to 1 / V2. V2. 1 / V. V. 1 / V2. V2. 1 / V. V. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a Gauss Seidel load flow method, the number of iterations may be reduced if the correction in voltage at each bus is multiplied by Acceleration factor Gauss constant Blocking factor Lagrange multiplier Acceleration factor Gauss constant Blocking factor Lagrange multiplier ANSWER DOWNLOAD EXAMIANS APP
Power Systems Hydro-graph is similar to both B and C. load curve. mass curve. energy load curve. both B and C. load curve. mass curve. energy load curve. ANSWER DOWNLOAD EXAMIANS APP