Power Systems The rating of CB is in terms of voltage. current. volt - ampere. VAR. voltage. current. volt - ampere. VAR. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Electrostatic precipitators in thermal power plants are used for removal of ash from flue gas All of these remove moisture from the cole control flow rate removal of ash from flue gas All of these remove moisture from the cole control flow rate ANSWER DOWNLOAD EXAMIANS APP
Power Systems The generating station suitable to operate as peak load plant is Thermal power station. Nuclear power station. Pumped storage. Power station. Thermal power station. Nuclear power station. Pumped storage. Power station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A load centre is at an equidistant from the two thermal generating stations G1 and G2. The fuel cost characteristics of the generating stations are given by F1 = a + bP1 + cP²1 F2 = a + b P2 + 2cP²2 Where P1 and P2 are the generation in MW of G1 and G2, respectively. For most economic generation to meet 300 MW of load, P1 and P2 respectively, are 175, 125 200, 100 100, 200 150, 150 175, 125 200, 100 100, 200 150, 150 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Plug setting of a relay can be altered by varying none of these. no. of ampere-turns. adjustable back up stop. air gap of magnetic path. none of these. no. of ampere-turns. adjustable back up stop. air gap of magnetic path. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Fault calculations using computer are usually done by Y bus method Z bus method None of these either 1 or 2 Y bus method Z bus method None of these either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP