Power Systems In a pressurized water reactor the coolant water boils in the reactor core. heavy water is used as both coolant and moderator. water is used at high pressure so that it is available is liquid from at about 280° C. both B and C. the coolant water boils in the reactor core. heavy water is used as both coolant and moderator. water is used at high pressure so that it is available is liquid from at about 280° C. both B and C. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 750 MW 500 MW 1250 MW 250 MW 750 MW 500 MW 1250 MW 250 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following methods is/are used for reactive or voltage compensation shunt capacitor series capacitor generation excitation control All of these shunt capacitor series capacitor generation excitation control All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Lightning arresters are made up of which material? copper silver any of the above silicon oxide copper silver any of the above silicon oxide ANSWER DOWNLOAD EXAMIANS APP
Power Systems Load frequency control is achieved by properly matching the individual machines reactive powers. turbine inputs. generated voltages. generator ratings. reactive powers. turbine inputs. generated voltages. generator ratings. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the sag(S) of a transmission line? S = wl²/8T S = wl²/4T S = wl²/2T S = wl²/16T S = wl²/8T S = wl²/4T S = wl²/2T S = wl²/16T ANSWER DOWNLOAD EXAMIANS APP