Power Systems What is the approximate efficiency of a normal thermal power station? 20-25% 30-40% 45-55% 60-70% 20-25% 30-40% 45-55% 60-70% ANSWER DOWNLOAD EXAMIANS APP
Power Systems Demand factor of a plant is 0 1 greater than 1 less than 1 0 1 greater than 1 less than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following quantities are to be calculated for generator bus? Q and δ δ and V P and Q P and V Q and δ δ and V P and Q P and V ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 0 MW and PG2 = 250 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 150 MW and PG2 = 100 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Rating of fuse wire is expressed in Ω. Watts. Mho. Ampere. Ω. Watts. Mho. Ampere. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Gas turbine plant. Thermal power plant. Hydro electric power plant. Nuclear power plant. Gas turbine plant. Thermal power plant. Hydro electric power plant. Nuclear power plant. ANSWER DOWNLOAD EXAMIANS APP