Power Systems In thermal power stations, economiser will reduce the thermal efficiency increase the thermal efficiency both 2 and 3 reduce the heat reduce the thermal efficiency increase the thermal efficiency both 2 and 3 reduce the heat ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Thermal power plant. Gas turbine plant. Hydro electric power plant. Nuclear power plant. Thermal power plant. Gas turbine plant. Hydro electric power plant. Nuclear power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which one of following fuels is used by slow thermal nuclear reaction for power generation Th232. U238. Pu239. U235. Th232. U238. Pu239. U235. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a thermal power plants, pressure in the working fluid cycle is developed by turbine. feed water pump. superheater. condenser. turbine. feed water pump. superheater. condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 0.6 0.5 0.75 1 0.6 0.5 0.75 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Location of a surge tank, in an hydro electric power station is near tail race. reservoir. dam. turbine. tail race. reservoir. dam. turbine. ANSWER DOWNLOAD EXAMIANS APP