Power Systems In thermal power stations, economiser will both 2 and 3 reduce the heat reduce the thermal efficiency increase the thermal efficiency both 2 and 3 reduce the heat reduce the thermal efficiency increase the thermal efficiency ANSWER DOWNLOAD EXAMIANS APP
Power Systems Peak load power plants is/are pumped storage plant both 1 and 2 diesel plant nuclear plants pumped storage plant both 1 and 2 diesel plant nuclear plants ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following are the fissile materials None of these. U235 and Th239. U238 and Th232. U235, U233 and Pu239. None of these. U235 and Th239. U238 and Th232. U235, U233 and Pu239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where is the draft tube of a hydroelectric plant that is an airtight pipe located In between the penstock and runner. In between the runner exhaust and the tail race. At the beginning of the penstock. Near the surge tank. In between the penstock and runner. In between the runner exhaust and the tail race. At the beginning of the penstock. Near the surge tank. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 100 MVA alternator operating at full load at 50 Hz. H = 4 MWsec/MVA, Td = 0.5 sec. One of the transmission line is tripped. So that output of generator is reduced to 70 MW. Find the frequency deviation during this time? -0.56 0.56 0.92 -0.92 -0.56 0.56 0.92 -0.92 ANSWER DOWNLOAD EXAMIANS APP
Power Systems When reactance grounding is used in network, the voltage between neutral and ground is IR0 × Xn 3×IR0 × Xn both 1 and 3 IN × Xn IR0 × Xn 3×IR0 × Xn both 1 and 3 IN × Xn ANSWER DOWNLOAD EXAMIANS APP