Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j1 pu j9 pu j6 pu j3 pu j1 pu j9 pu j6 pu j3 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is not a secondary nuclear fuel Pu239. U233. U235. None of above. Pu239. U233. U235. None of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power capacity of a transmission line can be increased by nether 1 nor 2 decreasing reactance value either 1 or 2 increasing voltage level nether 1 nor 2 decreasing reactance value either 1 or 2 increasing voltage level ANSWER DOWNLOAD EXAMIANS APP
Power Systems Sum of the elements of row i equal to shunt admittances connected to bus i. If this summation is zero, indicates there is no both 1 and 2 shunt admittance mutual coupling None of these both 1 and 2 shunt admittance mutual coupling None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is a reaction turbines Francis turbine and Kaplan turbine. Pelton turbine and Francis turbine. Kaplan and Pelton turbine. None of these. Francis turbine and Kaplan turbine. Pelton turbine and Francis turbine. Kaplan and Pelton turbine. None of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Switchgear equipment include relays and CB. switches. all of these. fuses. relays and CB. switches. all of these. fuses. ANSWER DOWNLOAD EXAMIANS APP