Power Systems The power level of nuclear reactor can be increase by ( K = multiplication factor ) raising the value of K above 1, but later bringing it back to K = 1. raising the value of K above 1 and keeping it at raised value. lowering the value of K below and keeping at that lowered value. lowering the value of K below 1 but later bringing it back to K = 1. raising the value of K above 1, but later bringing it back to K = 1. raising the value of K above 1 and keeping it at raised value. lowering the value of K below and keeping at that lowered value. lowering the value of K below 1 but later bringing it back to K = 1. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The essential requirement(s) for power plants to be operated as peak load plants are Capability of quick starts. Quick response to load variation. Low capital cost. All of these Capability of quick starts. Quick response to load variation. Low capital cost. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Galvanised steel is generally used as earth wire. stray wire. structural components. All of these earth wire. stray wire. structural components. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which type of connection is employed for current transformers for the protection of star- delta connected 3-phase transformer? delta-delta star-delta delta-star star-star delta-delta star-delta delta-star star-star ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load current in short circuit calculations are neglected because short circuit currents are greatly out of phase with load currents nether 1 nor 2 both 1 and 2 short circuit currents are much larger than load currents short circuit currents are greatly out of phase with load currents nether 1 nor 2 both 1 and 2 short circuit currents are much larger than load currents ANSWER DOWNLOAD EXAMIANS APP
Power Systems A gas turbine power plant is best suited for Emergency. None of these. Peak load. Base load. Emergency. None of these. Peak load. Base load. ANSWER DOWNLOAD EXAMIANS APP