Power Systems Maximum power transfer capability of transmission line can be increased by Using series capacitance Using bundled conductors All of these Parallel transmission lines Using series capacitance Using bundled conductors All of these Parallel transmission lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems Storage requirement can be determined from hydro-graph. both B and C. flow duration curve. mass Curve. hydro-graph. both B and C. flow duration curve. mass Curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Breaking current is a ------------------ value? RMS any of the above maximum average RMS any of the above maximum average ANSWER DOWNLOAD EXAMIANS APP
Power Systems The advantage of hydro electric power station over thermal power station is hydro electric power station can supply the power throughout the year the operation cost of hydro electric power station is low the initial cost of hydro electric power station is low hydro electric station can be constructed at the place where the energy is required hydro electric power station can supply the power throughout the year the operation cost of hydro electric power station is low the initial cost of hydro electric power station is low hydro electric station can be constructed at the place where the energy is required ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 0.25. 0.83. 1.3. 0.44. 0.25. 0.83. 1.3. 0.44. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In coal fired thermal power stations, what are the electrostatic precipitators used for? All of these To collect the dust particles from the flue gases To keep the air heaters clean To remove dust particles setting on the bus bar conductors in the station switch yard All of these To collect the dust particles from the flue gases To keep the air heaters clean To remove dust particles setting on the bus bar conductors in the station switch yard ANSWER DOWNLOAD EXAMIANS APP