Power Systems Maximum power transfer capability of transmission line can be increased by Using series capacitance All of these Using bundled conductors Parallel transmission lines Using series capacitance All of these Using bundled conductors Parallel transmission lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 1.3. 0.44. 0.83. 0.25. 1.3. 0.44. 0.83. 0.25. ANSWER DOWNLOAD EXAMIANS APP
Power Systems String efficiency depends upon all of these. no. of SCR in the string. voltage rating of one SCR. voltage rating of whole string. all of these. no. of SCR in the string. voltage rating of one SCR. voltage rating of whole string. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following statement are false In a nuclear reactor, multiplication factor is kept almost equal to one. In nuclear power plants, chain reaction is controlled by cadmium rods. Nuclear power plants are used as peak load plants only. A thermal reactor needs a moderator material. In a nuclear reactor, multiplication factor is kept almost equal to one. In nuclear power plants, chain reaction is controlled by cadmium rods. Nuclear power plants are used as peak load plants only. A thermal reactor needs a moderator material. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If a fault occurs on any feeder, the fault current is much higher than with unsectional bus bar. equal to unsectional bus bar. much lower than with unsectional bus bar. none of these. much higher than with unsectional bus bar. equal to unsectional bus bar. much lower than with unsectional bus bar. none of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 500/5. The plug setting multiplier for a fault current of 5 kA is 8 2 5 6 8 2 5 6 ANSWER DOWNLOAD EXAMIANS APP