Power Systems Installation of capacitors at suitable locations and of optimum size in a distribution system results in All of these reduction in distribution power loss reduction of KVA rating of distribution transformers improved voltage regulation All of these reduction in distribution power loss reduction of KVA rating of distribution transformers improved voltage regulation ANSWER DOWNLOAD EXAMIANS APP
Power Systems Load frequency control is achieved by properly matching the individual machines generated voltages. reactive powers. generator ratings. turbine inputs. generated voltages. reactive powers. generator ratings. turbine inputs. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The sequence components of the fault current are as follows : Ipositive = j1.5 pu, Inegative = − j0.5 pu, Izero = − j pu Which fault is this? LLG. LG. LLLG. LL. LLG. LG. LLLG. LL. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A fault occurring at the terminals of an unloaded synchronous generator operating at its rated voltage has resulted in the following values of currents and voltages. IR0 = j 2.37 pu IR1 = -j 3.05 pu IR2 = j 0.68 pu VR0 = VR1 = VR2 = 0.237 pu. Which of the following faults has occurred? LG LLL LLG LL LG LLL LLG LL ANSWER DOWNLOAD EXAMIANS APP
Power Systems Counter poise is used for proper discharging of lighting surges reduce losses more surge impedance less surge impedance proper discharging of lighting surges reduce losses more surge impedance less surge impedance ANSWER DOWNLOAD EXAMIANS APP
Power Systems For variable heads of near about but less than 30 meters, which type of turbine is used in hydro power station? Francis Kaplan Pelton None of these Francis Kaplan Pelton None of these ANSWER DOWNLOAD EXAMIANS APP