Power Systems IF the time of operation of a relay for unity TMS is 10 sec then the time of operation for 0.5 TMS is 20 sec. 10 sec. none of these. 5 sec. 20 sec. 10 sec. none of these. 5 sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a plant capacity of 200 MW and maximum power demand is 150 MW. If average power generation is 110 MW, then find the load factor and capacity factor respectively? 0.733 and 0.55 0.65 and 0.55 0.733 and 0.65 0.55 and 0.733 0.733 and 0.55 0.65 and 0.55 0.733 and 0.65 0.55 and 0.733 ANSWER DOWNLOAD EXAMIANS APP
Power Systems To improve the efficiency of thermal power plant ________________ is placed between boiler and turbine. economizer. ash handling point. superheater. air preheater. economizer. ash handling point. superheater. air preheater. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Installation of capacitors at suitable locations and of optimum size in a distribution system results in reduction in distribution power loss All of these improved voltage regulation reduction of KVA rating of distribution transformers reduction in distribution power loss All of these improved voltage regulation reduction of KVA rating of distribution transformers ANSWER DOWNLOAD EXAMIANS APP
Power Systems Plant capacity factor value is greater than 1 1 0 less than 1 greater than 1 1 0 less than 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which cooling is preferred for large turbine generator Oxygen cooling. Nitrogen cooling. Hydrogen cooling. None of these. Oxygen cooling. Nitrogen cooling. Hydrogen cooling. None of these. ANSWER DOWNLOAD EXAMIANS APP