Power Systems More efficient plants are used as peak load plant None of these both 1 and 2 base load plant peak load plant None of these both 1 and 2 base load plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Ash handling unit. Condenser. Pulversing unit. Cooling tower. Ash handling unit. Condenser. Pulversing unit. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP
Power Systems On what factors does the selection of a water turbine depend All of above. Working head. Nature of load. Speed. All of above. Working head. Nature of load. Speed. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For 66 kV lines the number of insulator discs of each 11 kV used are 3 5 6 12 3 5 6 12 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pump storage schemes are used to improve the diversity factor. the load factor. the plant capacity factor as well as the load factor of the power system. the power factor. the diversity factor. the load factor. the plant capacity factor as well as the load factor of the power system. the power factor. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Corona loss is ----------------- on hilly areas than as plain areas. remain same less None of these more remain same less None of these more ANSWER DOWNLOAD EXAMIANS APP