Power Systems More efficient plants are used as peak load plant both 1 and 2 base load plant None of these peak load plant both 1 and 2 base load plant None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems If sag in an overhead line increase, tension in the line decrease None of these remains same increase decrease None of these remains same increase ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge tank is kept very close to the turbine generator pen stock spill way turbine generator pen stock spill way ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3 layer and diameter of each strand is d, then find the total diameter of ACSR conductor? 5d d 2d 3d 5d d 2d 3d ANSWER DOWNLOAD EXAMIANS APP
Power Systems In order to have lower cost of power generaion The load factor and diversity factor should be high the load factor should be low but diversity factor should be high the load factor should be high but diversity factor should be low the load factor and diversity factor should be low The load factor and diversity factor should be high the load factor should be low but diversity factor should be high the load factor should be high but diversity factor should be low the load factor and diversity factor should be low ANSWER DOWNLOAD EXAMIANS APP
Power Systems If transmission line parameters A and B are 0.9∠0° and 200∠90° respectively. Find the shunt reactor required to compensate the ferranti effect? 750 Ω 1500 Ω 2000 Ω 3000 Ω 750 Ω 1500 Ω 2000 Ω 3000 Ω ANSWER DOWNLOAD EXAMIANS APP