Power Systems

Power Systems
More efficient plants are used as

 peak load plant
 both 1 and 2
None of these
 base load plant

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 1-phase transmission line has an impedance (4 + 3j ) Ω. Find the power factor of the load for zero voltage regulation?

 0.6 lag
 0.6 lead
 0.8 lag
 0.8 lead

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a 4*4 Y bus matrix the number of non zero elements are 12. Find the sparsity of the system?

 1
 0.25
 0.75
 0.5

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The insulator thickness on the conductor, in cables depends upon

 current
 reactive power
 voltage
 power factor

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following method is used for changing power factor from leading to lagging

 series capacitor
 shunt capacitor
 any of the above
 shunt reactor

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Specified quantities of load bus are

 P and Q
 P and δ
 V and δ
 Q and V

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑