Power Systems More efficient plants are used as peak load plant None of these both 1 and 2 base load plant peak load plant None of these both 1 and 2 base load plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems In triangular configuration, inductance and capacitance values are ------ and ------ respectively less, less higher, less higher, higher less, higher less, less higher, less higher, higher less, higher ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Hydro Power Plant Nuclear. Thermal. Gas-turbine. Hydro Power Plant Nuclear. Thermal. Gas-turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The corona loss on a particular system at 50 Hz is 1 kW/km per phase. What is the corona loss at 60 Hz in kW/km per phase? 0.89 1.13 1 1.25 0.89 1.13 1 1.25 ANSWER DOWNLOAD EXAMIANS APP
Power Systems How much KWh energy is produced by fission of 1 gm of uranium U235 2400 kWh. 24000 kWh. 24 kWh. 240 kWh. 2400 kWh. 24000 kWh. 24 kWh. 240 kWh. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Deaerative heating is done to remove dissolved gases in water. remove dissolved. heat the feed water. heat the steam. remove dissolved gases in water. remove dissolved. heat the feed water. heat the steam. ANSWER DOWNLOAD EXAMIANS APP