Power Systems

Power Systems
More efficient plants are used as

 peak load plant
None of these
 both 1 and 2
 base load plant

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following will take least time in starting from cold condition to full load operation

  Hydro electric power plant.
 Gas turbine plant.
 Nuclear power plant.
 Thermal power plant.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following statements is/are true? Corona is reduced by

 increasing the distance between the conductor
All of these
 decreasing the supply frequency
 increasing the radius of the conductor

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If the breakdown voltage of the insulator is high, the thickness of the insulator is

 less
 it does not related to breakdown voltage
 high
None of these

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠°90 Ω, C = 0.5*10^-6∠90° â„§. Find Charging current under no load?

 0.144∠90° A/phase
 0.344∠90° A/phase
 0.512∠90° A/phase
 1.144∠90° A/phase

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Mho relay is usually employed for protection of

 long transmission lines only
 any line
 short transmission lines only
 medium transmission lines only

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑