Power Systems More efficient plants are used as peak load plant None of these both 1 and 2 base load plant peak load plant None of these both 1 and 2 base load plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Hydro electric power plant. Gas turbine plant. Nuclear power plant. Thermal power plant. Hydro electric power plant. Gas turbine plant. Nuclear power plant. Thermal power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements is/are true? Corona is reduced by increasing the distance between the conductor All of these decreasing the supply frequency increasing the radius of the conductor increasing the distance between the conductor All of these decreasing the supply frequency increasing the radius of the conductor ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the breakdown voltage of the insulator is high, the thickness of the insulator is less it does not related to breakdown voltage high None of these less it does not related to breakdown voltage high None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠°90 Ω, C = 0.5*10^-6∠90° â„§. Find Charging current under no load? 0.144∠90° A/phase 0.344∠90° A/phase 0.512∠90° A/phase 1.144∠90° A/phase 0.144∠90° A/phase 0.344∠90° A/phase 0.512∠90° A/phase 1.144∠90° A/phase ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mho relay is usually employed for protection of long transmission lines only any line short transmission lines only medium transmission lines only long transmission lines only any line short transmission lines only medium transmission lines only ANSWER DOWNLOAD EXAMIANS APP