Power Systems More efficient plants are used as base load plant None of these both 1 and 2 peak load plant base load plant None of these both 1 and 2 peak load plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the penalty factor of a plant is unity, its incremental transmission loss is -1 1 0 None of these -1 1 0 None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The essential requirement(s) for power plants to be operated as peak load plants are Quick response to load variation. All of these Capability of quick starts. Low capital cost. Quick response to load variation. All of these Capability of quick starts. Low capital cost. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the number of insulator discs required in string insulator, if operating voltage is 220 kV and maximum voltage of each disc is 11 kV? 10 21 13 20 10 21 13 20 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In load flow studies PV bus is treated as PQ bus when phase angle become high voltage at the bus become high any of the above reactive power goes beyond limit phase angle become high voltage at the bus become high any of the above reactive power goes beyond limit ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has self and mutual impedances are 0.8 and 0 pu respectively. Find the positive, negative and zero sequence impedances respectively? 0.6, 0.8 and 1.2 pu 0.6, 0.6 and 0.6 pu 0.6, 0.6 and 1.2 pu 0.8, 0.8 and 0.8 pu 0.6, 0.8 and 1.2 pu 0.6, 0.6 and 0.6 pu 0.6, 0.6 and 1.2 pu 0.8, 0.8 and 0.8 pu ANSWER DOWNLOAD EXAMIANS APP