Power Systems More efficient plants are used as both 1 and 2 base load plant None of these peak load plant both 1 and 2 base load plant None of these peak load plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following buses is/are not PV buses? fixed shunt capacitor buses reactive power support buses voltage control buses both 1 and 2 fixed shunt capacitor buses reactive power support buses voltage control buses both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pelton wheel turbine is a high head turbine. none of above. medium head turbine. low head turbine. high head turbine. none of above. medium head turbine. low head turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems By using guard ring in a transmission line, its string efficiency decrease None of these increase remains unaffected decrease None of these increase remains unaffected ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the relation between sub transient (X"), transient (X') and synchronous reactance (X) ? X" < X' > X X" > X' >X X" < X' < X X" > X' < X X" < X' > X X" > X' >X X" < X' < X X" > X' < X ANSWER DOWNLOAD EXAMIANS APP
Power Systems The line current IR flowing into balanced delta connected load is - j5 - 3 A. If the phase sequence is RYB the phase current IYB is 10. 5. 20. 55.1. 10. 5. 20. 55.1. ANSWER DOWNLOAD EXAMIANS APP